Cvs-2X100 Central Vacuum Pump System

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 5900

Description

Product Description


CVS Central Vacuum System:

CVS Series Central Vacuum System is all-in-one vacuum equipment, consist of sv single stage rotary vane vacuum pump, vacuum tank, vacuum gauge, electric controller and vacuum pipes.


Product Parameters

ModelPumping Speed(m3/h)Vacuum PumpQuantityVacuum Pressure
(Mpa)
Vacuum Tank
(L)
CVS-1X01010SVF01010~-0.160~300
CVS-1X02020SVF02010~-0.160~300
CVS-1X04040SVF04010~0.160~300
CVS-1X06363SVF06310~0.160~300
CVS-1X100100SVF10010~0.160~300
CVS-1X160160SVF16010~0.1300~2000
CVS-1X250250SVF25010~0.1300~2000
CVS-1X300300SVF30010~0.1300~2000
CVS-2X01020SVF01020~0.160~300
CVS-2X02040SVF02020~0.160~300
CVS-2X04080SVF04020~0.1300~2000
CVS-2X063126SVF06320~0.1300~2000
CVS-2X100200SVF10020~0.1300~2000
CVS-2X160320SVF16020~0.1300~2000
CVS-2X250500SVF25020~0.1300~2000
CVS-2X300600SVF30020~0.1300~2000
CVS-3X160480SVF16030~0.1300~2000
CVS-3X250750SVF25030~0.1300~2000
CVS-3X300900SVF30030~0.1300~2000
 

Our Advantages

1. Using environmental protection and high efficiency vacuum pump,
2. Manual and automatic can be choose, vacuum degree can adjust,
3. Easy to operating, big pumping speed, satisfy with any medical operation's big flowrate vacuum needs,
4. Easy to moving, small space, no need pump house, can install anywhere,
5. All-in-one CVS series is enterprises' first choice vacuum system. 

Exhibition

 

FAQ

Q1: If I want to inquiry, what can I need to offer?
A1: Please tell us your Working Vacuum Degree(Pa,mbar or torr), Flowrate(L/S or M3/H) and Usage.

Q2: Do you have MOQ?
A2: 1Pcs is ok,if you have more quantity, the price will be cut down.

Q3: How long to delivery?
A3: We need about 4-5 weeks to produce,then extra need about 5-7 days to arrange domestic delivery and port clearence.

Q4: What is your payment term?
A4: 50% for prepayment, then the balance should paid before delivery, by TT.

Q5: How long for the warranty?
A5: 1 year for whole machine, the effective date of warranty should be counted from one month the goods arrived in client's site. If the pump go wrong, the client can choose back the pump to factory repair,or we offer remote technical support.

 

Scroll to Top