Heat plate exchanger The beverage pump extracts the raw liquid into the temporary storage tank, pressurizes the liquid in the tank to the plate heat exchanger through the high pressure pump for cooling, then mixes with the carbon dioxide gas, and finally enters another storage tank for secondary mixing, increasing the mixing effect, so that the carbonated beverage is completed and the stainless steel pipe is connected to the filling machine. Area: 5 Material: SUS304 | |
Carbonation tank 304/316 Stainless steel balanced pressure tank. Mixing uniformity, the proportion is accurate: Use flow meter to control liquid and CO2 ratio. The structure is healthy and easy to clean The machine adopts a closed system made by stainless steel and has the CIP flavor cleaning equipment to clean the equipment and pipeline by the liquid antiseptic and hot water, and then to ensure the beverage made by the machine can meet the health requirements. | |
Electronic control part Electronic control for whole working process; Alarm device will work if any fault occurs; The operation just needs to start the button on turn according to the required procedures, and then you can achieve normal operation. There is no need to replace any parts, can adjust the production capacity and the mixture ratio of drink. | |
Chiller system CO2 gas regulator Cylinder Purifier Gas Heater Pressure Relief Valve Water cooler Water tank, refrigeration unit Air-water mixer Film type, spray type, spray type Membrane air-water mixer |
Model | QHS-1500 | QHS-2500 | QHS-5000 | QHS-8000 | QHS-10000 | QHS-12000 |
Output(L/Hr) | 1000-1500 | 2000-3000 | 4000-5000 | 8000-9000 | 10000-12000 | 12000-14000 |
CO2 content | 1.5-2.5 | >2.5 | >3 | >3.5 | >3.5 | >3.5 |
Chilled water inlet temperature | 0-4ºC | |||||
Sugar water ratio | 1:3-1:6 | |||||
Working pressure | 1.0MPa | |||||
Water pressure | 1.25MPa | |||||
Co2 content | 2.2-4.2 | |||||
Application | Carbonated soft drink bottling line | |||||
Total power | 2.2kw | 3.5kw | 5.5kw | 7.5kw | 8.2kw | 11kw |
Overall dimensions | 2.5*1.9m | 2.8*1.9m | 3.2*2.2m | 3.4*2.5m | 4.8*2.3m | 5.5*3.3m |
Height | 2.3m | 2.5m | 2.5m | 2.5m | 2.5m | 2.5m |
Weight | 1000kg | 1500kg | 2000kg | 3500kg | 5000kg | 6000kg |
I. Water Treatment System Different water sources with different equipment Raw water pump: Silica sand filter: Active carbon filter:chlorine content Sodium ion exchanger (softener): Precision filter: Reverse osmosis: UV: Ozone: Finished water tank: | |
Flavoured drink mixing system Cooling and heating tank syrup bolier and mixing filter CIP cleaning system | |
Drink Carbonation system Syrup melting tank Syrup filter Prepare tank Syrup cooler Syrup pump Chiller Cool drink water tank,Co2 filter, Drink mixer | |
BXGF system washing filling and capping monoblock This automatic carbonated drink filling machine has a compact structure, perfect control system, easy to operate and highly automated. | |
CIP Washing System The King Machine automatic machines and productions lines are equipped with necessary additional equipment for complex fulfillment of customer's technical tasks. | |
OPP labeling machinery This is new and popular machinery ,label cost is cheaper than PVC, but most large drink factory chooses it | |
Adhesive labeling machine. One Label , Double labels , three labels This machine adopts international advance technology; Stick the label on the Glass or PET bottle,And then fix on the position which bottle body designated.It is controlled by mirco-computer;automatic detection and position. This machine's structure is compact,and suitanble for the production line of different direction and different height. | |
Bottle Packaging Machine. PE Film Packaging Machine It adopts the photoelectric sensor to detect online, gather signals which are controlled by PLC, and adopts piston as executable element, to realize product conveying, combination, film wrapping, cutting, heat& shrink, cool and finally get the finished product. |
1. The guarantee of our machines is 5 years, life-long services, also we will supply spare parts along with the machines free of charge, the parts will be enough for at least 3 years for the normal operation of machine.
2. Trainning: We can train your engineers in our factory free of charge. IMeans you can send your engineers to our factory to study and training, we have rich experiences for the training, it is the good way to make sure that you can operate and maintain our machines successfully and for long time normal use.
3. Checking We will supply you detail user manual for our machines, also we will make one Video CD to show you how to install and maintain the machines, it will help you to maintain the machines for the long time.
4. Installtion We will send our engineers to your factory to install the machines and train your staff how to operate the machines., We have been doing the install jobs for our overseas customers for many years.
5. Spare parts:We will help to arrange the shipping of goods for you and keep you posted about the steps.
SUZHOU YAOSHI MACHINERY FACTORY (Sanxing Huifeng Machinery Co., Ltd).Is a professional manufacturer engaged in the production of beverage filling machine. Founded in 1999, the building area of 15000 square meters. The company is located in the convenient transportation and beautiful scenery of the national health city - Zhangjiagang City.
The company has a variety of technical personnel, a high-quality, young, full of team spirit and innovative workforce, with the development, design, development, manufacturing expertise, in recent years the introduction of a large number of domestic and foreign advancedprocessing equipment, testing instruments and multiple CNC machining centers, from raw materials to strict control testing of each production process, and effective control, the implementation of standardized and scientific modern enterprise management.