Automatic Shopping Paper Bag Machine with Twisted Rope Handle Inline

Min.Order: 1
Product origin: Wenzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 50000

Description
Product Description



Fully automatic square bottom paper bag machine is designed for the production of paper bags with twisted handles. It is suitable for mass production of shopping bags in industries such as food and clothing. The one-line process consists of twisted handles making from paper rolls and twisted rope, delivery of handles to paste unit, pre-cutting of paper on position of rope, patch position gluing, handle pasting, and paper bag making. The paper bag making process consists of side gluing, tube forming, cutting, creasing, bottom gluing, bottom forming and bag delivery. This machine adopts German imported high-speed motion controller (CPU), which controls the operation of servo through high-speed bus to ensure stable movement and smooth motion curve. It is the automatic square bottom paper bag equipment with handles inline preferred by the majority of printing and packaging manufacturers.

 

Schematic Diagram

 
Production Flow


 

Product Parameters

 

Parameter Name330T450T450BT
Cutting Length270-530mm270-530mm380-760mm
Cutting Length(Handle)270-430mm270-430mm380-660mm
Bag Width120-330mm210-450mm220-450mm
Bag Width(Handle)200-330mm210-450mm240-450mm
Bottom Width60-180mm90-180mm100-200mm
Paper Thickness60-150g/m^280-150g/m^280-150g/m^2
Paper Thickness(Handle)80-150g/m^280-150g/m^280-150g/m^2
Paper Roll Width380-1050mm590-1290mm630-1370mm
Paper Roll Width(Handle)620-1050 mm670-1290mm710-1370mm
Roll Paper DiameterΦ1200mmΦ1200mmΦ1200mm
Paper CoreΦ76mmΦ76mmΦ76mm
Patch Length152mm190mm190mm
Patch Width50mm50mm50mm
Handle Distance75mm95mm95mm
Rope DiameterΦ3-5mmΦ3-5mmΦ3-5mm
Patch Paper Roll Width100mm100mm100mm
Patch Paper Roll DiameterΦ1200mmΦ1200mmΦ1200mm
Patch Paper Thickness100-135g/m^2100-135g/m^2100-135g/m^2
Machine Speed30-200bags/min30-180bags/min30-150bags/min
(Without Handles)Production Speed For Bags With Handles30-180bags/min30-150bags/min30-120bags/min
Production Speed For Bags With Handles30-150bags/min30-130bags/min30-130bags/min
Bottom Folding Type   
Cutting KnifeSawtooth cuttingSawtooth cuttingSawtooth cutting
Power Supply380v 3phase 4 line 41.5kw380v 3phase 4 line 41.5kw380v 3phase 4 line 43.5kw
Machine Weight15000kg15500kg16500kg
Machine Size14000x6000x2400mm14000x6000x2400mm16100x6500x2400mm
Bottom folding type

 

Application


Detailed Photos

 

 
 Use France SCHNEIDER touch screen human-computer interface, making the machine easy to operate and control.
√ Adopt Germany original LENZE PC control, integrated with optical fiber. Thus ensure stable and high speed running.
√ Adopt Germany original LENZE servo motor and German original SICK photoelectric eye correction, tracking printing bag accurately.
√  Raw material loading adopts hydraulic auto-lifting structure. Unwind unit adopts auto tension control.
√ Raw material unwinding EPC adopts Italy SELECTRA, reducing material alignment time.

 
Packaging & Shipping

 


 
Certifications

 

Hot Selling Machines

DCWZ-XB700/XB800
Fully Automatic Non Woven Bag Making Machine
DCZZ-A330/A400/A550
Automatic square bottom paper bag making machine
DCTY-1200
Computer Control High Speed Rotogravure Printing Machine
DCWZ-D500
Non Woven U-cut Bag Manufacturing Machine
DCZZ-C270/C330
V Bottom Paper Bag Machine
FAQ

Q1. How to install and operate the machine?

Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.

After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.

Q2. What should we charge for your engineer?

The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.

Engineer's salary is 
USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.

Q3. How long is your machine's warranty period?

Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.

The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.

Q4. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.

Q5. How do you arrange packing for machine?

As per export standard, they will also be treated before delivery against damage and rusting.




Product Tag:
Related categories:
Scroll to Top