Fully Automatic Double Side Sealer Packaging and Thermo Shrink Packing Machine for Wooden Door, Glass Furniture and Building Materials

Min.Order: 1
Product origin: Huizhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 7828 ~ 8892

Description

 Fully Automatic Double Side Sealer Packaging and Thermo Shrink Packing Machine for Wooden Door, Glass Furniture and Building Materials

Product Description

 

Automatic Vertical L Bar Sealer Shrink Wrap Machine
5545DI is controlled via a PLC which allows the operator to set the different times for the sealing operating,the temperature of the blades and also the length of film that is to be used. The machine has a variable conveyor speed controller which makes the machine ideal for both manual and automatic feeding. The vertical sealing height is adjustable to the height of the product, allowing for the sealing line to be in the center of the package. The machine is easy to operate and high in efficiency.
MODEL
GPL-5545DI
Film
POF
Packing Speed
15~40pcs/min
Packing Size
W+H<380, L+H<450     H<180,   L≥100mm
Cutter size / Tunnel size
450*555mm
Max Temperature
230°C
Electrical
220V 50-60Hz
Power
3.0KW
Max Current
10A
Air Compressing
0.6--0.85MPa
Table Height
850+30mm
Machine dimension
L1785*W1420*H1340mm
Machine Weight
650 kg
Company Profile

 

Huizhou Gurki Intelligent Equipment Co., Ltd is a leading manufacturer of automated packaging machines since 1997, located in Huizhou, China. Gurki engineers and manufactures affordable industrial packaging equipment customized to fit a variety of industries. We design and manufacture shrink wrapping machine, case erectors, case sealers, E-commerce packaging machine, tray erector,specifically for your packaging system application, at our 120,000 square meters factory. Gurki is an innovative and customized expert not only in China but also internationally. He is committed to providing high quality and trustworthy machines to customers in 100 countries around the world for years. 
Our Advantages

With over 25 years' experience in the industry, GURKI experts in research and develop team have numerous approach on different application. With our complete facilities production plant, it allow us to offer custom made equipment for special needs.Gurki all adopt well-known imported brands to produce machines, to ensure the precision of each of our materials and each accessory, to ensure that the quality of the machines we produce is ahead of our industry. We invest a lot of money, we use the best equipment, only the best high-end products.

After the machine is completed, our workshop personnel will carry out multiple commissioning and inspection to ensure that the customer gets the most suitable mode. Before shipment, a quality inspection video is taken to ensure that our customers can easily install and start the machine when they get it. At the same time, we provide online installation, maintenance guidance services,up to 12 months warranty period.
Oversized spare parts warehouse, we produce our own spare parts our own production machines, all accessories are tailored, adding the greatest guarantee for our machines, with sufficient spare parts inventory, so that our customers can rest assured of production.
Certifications

Packaging & Shipping

FAQ

1.What's your advantage? Why we choose you?
A1: 25+ Years of experience in packaging machine production and R&D. We have the most professional techniques and team, according to the customer requirements, we support customized machine.
A2: We are a professional manufacturer and warmly welcome clients from worldwide to visit our factory and cooperate with us.

 

2.What are the payment terms?
A1: T/T would be better with quick transfer and few bank fees,30% deposit, balance before shipment. 
A2: LC could also be accepted, but the procedure is complex and the fee is high.

 

3.What is the service?
7 days 24 hours online service, engineer oversea service is also available if necessary.

 

4.Warranty of the machine?
One year warranty except for the consuming spare parts.

 

5.What are the delivery terms?
FOB Shenzhen, CNF destination port under LCL and FCL is available.

 

6.What is the delivery time?
5-30 working days after the confirmation of the order.

Product Tag:
Related categories:
Scroll to Top