Drill Pipe Screen Us for Mwd

Min.Order: 10
Product origin: Dongying, Shandong, China
Infringement complaint: complaintComplaint
US$ 200

Description


Drill Pipe Screen

I. Introduction:
Size: 5-1/2", 5", 4-1/2", 3-1/2", 2-7/8"
Application: when used on oilfield drilling, the drill pipe screen is put on the top box connection of the drill pipe, used to
filter the drilling fluid, to prevent sundries from falling into the well, and ensure MWD devices can normally work during the
drilling, also can effectively protect drill bits normally working from any accident.

II. Specifications:
SpecificationMaterialThickniessTray diameterWeightRemarks
2-7/8"3043591Customization according to
clients special requirements is
acceptable, as long as the client
clearly stated drill pipe specs, the
length of the pipe screen, the wall
thickness, the material.
3-1/2"3732
43842.5
4-1/24932.7
551053
5-1/2"51163.5

III. Features:
(1) The material is stainless steel, anti-corrosion;
(2) With more filter holes, the hole size is small, the discharge area is big, bringing good filter effect, no-blocking;
(3) The wall thickness of the stainless material is 3mm-5mm, also can be thicker, the pipe is taper tube, also can be
according to client's clients' special requirements to make special surface treatment for erosive wear resistance.
(4) The filter holes are round or long striped according to clients' requirements;
(5) The pipe screen of 3-1/2" and 5" are always in stock, other sizes may be needed to produce according to orders, as
the demands are not so much.
(6) If clients have any special requirements, customization is also accepted.

package:

FAQ
 

How can I place order? 

A: You can contact us by email about your order details, or place order on line. 


How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.

What's the order procedure? 
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr-epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. 

How do you take care when your clients received defective products? 
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. 

Scroll to Top