Car Paint Booth Price, Car Oven Painting Booth Spray Booth Paint

Min.Order: 1
Product origin: Yancheng, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 6000 ~ 12000

Description
Australia Standard Spray Booth Bus Paint Spray Booth for 18000*5000*5000 (Model: JZJ-FB-18)

Product description
Outside Dimension (mm)18156*6906*5800(L*W*H) Inside Dimension(mm)18000*5000*5000(L*W*H)
Front Door(mm)4000*4500(W*H)Service door (mm)800*2000(W*H)
Total Power98KW
Cabin systemWall panel  75mm EPS sandwich panel, steel sheet thickness: 0.6mm
Ceiling panel 50mm rock-wool panel.
Windows4mm safety tempered glass
Air Make-up SystemAir Inlet fan system6*7.5kw centrifugal belt-drive fan, proof-explosion motor. 
Exhausted fan system3*15kw centrifugal belt-drive fan, proof-explosion motor. 
Ai capacity for fresh air22000m3/h *6
Air capacity for exhausted air19500m3/h *3
Air Flowing speed0.25m/s in empty booth
Air Control methodOne manual damper for exhausted system
Exhausted ducting6meters straight ducting, one 90°elbow for each unit fan system.
Purification SystemPre-filterG3 grade
Ceiling filterEU5 / F5
Floor filtergreen fiber glass filter / G3 grade
Exhausted fan FiltersM green fiber glass filter. 
Heating SystemHeat ExchangerSUS304 material, argon arc welding.
Heating burner:        3 sets Riello RG5S diesel oil burner(gas burner for option)   
Heating productivity                             260000Kcal/h/ burner
Spray to baking switch20N BELIMO brand electrical damper
Chimney ducting6 meters stainless ducting for each heating system
Max heating temperature80degrees
fuel consumption10-15L /vehicle
Lighting SystemCeiling lights22 Units, each 4 x 36W lamps, Total 3312 W
Side lights26 Units, each 2 x 36W lamps, Total 1872 W
Illumination 900LUX
Controlling systemMicro-computerized programming system Spraying & baking switch, lighting switch, emergency stop, 
breakdown alarm, failure alarm, pressure gauge

Q: Which Port of loading?

A: Mainly ship from Ningbo port / Shanghai Port/Guangzhou Port.

 

Q: What is your MOQ?

A: All the products can be mixed in one container with low MOQ 1pcs.

 

Q: What is the Lead Time?

A: Normally it needs 20-25 days.

 

Q: What is the Payment Terms?

A: T/T/ 30% deposit before production and 70% before delivery.

Product Tag:
Related categories:
Scroll to Top