Urban Household Waste Treatment/Support Customization/Pyrolysis Equipment

Min.Order: 1
Product origin: Shangqiu, Henan, China
Infringement complaint: complaintComplaint
US$ 80000 ~ 650000

Description
1.Working Theory of Pyrolysis Process
 
   Specification
No.NameParameter
1The Raw Materialsolid waste/ waste rubber/ waste plastics/ waste tyre
2Total Capacity5t/day, 10t/day, 12t/day, 50t/day
3The size of reactor2.6m*6.6m, 2.6m*7.7m, 2.6m*8.8m, customized
4Average oil productivitytyre:40%-50%,plastic:60%-70%
5Average carbon productivity30%-35%
6Average steel productivity10%-15%
7Average waste-gas productivity5%
8Pyrolysis time8h
9Discharge time3h
10Feeding timme1h

     First of all, the gas explosion compression technology of domestic waste is used to reduce the amount of domestic waste: the waste will be extremely compressed, sterilized, dewafered and deodorized.The waste water extruded by the gas explosion equipment is transmitted to the water purification system through pipelines.The odor will be sent to the gas purification system for spraying,adsorption, UV photo oxygen decomposition,etc.

     Then, the treated domestic garbage is transported to the garbage pyrolysis and carbonization system for harmless treatment: plastic, foam, film and other substances with high calorific value can produce clean hydrocarbon fuel after high-temperature cracking,and its chemical formula is CnH2n and cnh2n+2  (1 ≤n≤16) ; Organic solid wastes such as waste paper and kitchen garbage can produce carbon black and organic fertilizer base materials after high-temperature cracking: Waste metal and building materials waste do not undergo chemical and physical reactions in the equipment.

    Finally, domestic waste is reduced, harmless and resourceful.


2.Main Parts
2.1 Reactorto crack fuel oil and carbon black from waste plastic, tires, urban waste, etc.
2.2 Heating system: to supply energy for whole system operation.
2.3 Condensing system: to liquefy  the gas oil into liquid oil with cycle water and store the fuel oil into the tempory tanks
2.4 Carbon black discharging and collecting system
3. Basic Operation

4.Our Advantages

1. The pyrolysis furnace body adopts the structure of heat storage body, which fully recycles the waste heat. That can not only extend the service life of the main furnace, but also save fuel, leading to further savings in production costs.

2. The furnace bladder adopts specially high-temperature resistant quasi-brand boiler steel, and the service life can reach 8 years.

3. The equipment is installed with self-developed infrared anti-blocking early warning dredging device, which is the exclusive device developed by our company. It can figure out pipeline blockage phenomenon in the production process, sound an early warning and automatically solve the problem to ensure that the main furnace will not have safety problems due to pipeline blockage during the production process.

4. The slag discharge system adopts a double-cycle structure, which controls the slag discharge time within about 40 minutes. The system can discharge slag quickly and cleanly. 

5. Self-developed chemical accelerator of our company increases the oil yield by 3%-8%.

6. Adopting a new exhaust gas purification system can make the gas emitted after purification meet the relevant national emission standards.

7. Excess combustible gas is dehydrated and desulfurized by the purification system and then stored in a gas storage tank after compression by a special gas compressor, which can be used for heating later, and can also be supplied to gas generators for use or sale.

8. The main furnace uses more convection vents and rapid cooling devices, so that its temperature drops below 100 degrees within three hours.


5. Our Services
 
5.1 Pre-sales Service:
    The wide product range enables us to provide our customers with machines or complete processing plants.
Based on our customers' request and budget, our experts make efficient and reliable solutions.
Following customers' order we produce strictly. What's more, before placing the order every customer has the chance to visit working machines or complete plant in the site .

5.2 After-sales Service:
1.Quality warranty period: One year warranty for the reactor ,and lifetime maintenance for complete set of machines. pay the double air tickets, accommodation and food.

2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer's site including the training of skills of buyer's workers on operation, maintenance, etc.

3.Supply layout according to buyer's workshop and land, civil works information, operation manuals, etc. to the buyer.

4. For the damage caused by the users, our company provides the parts and accessories with cost price.

5. Our factory supplies the wearing parts with the cost price to clients.


6.Company Introduction
Shangqiu Zhongqing Environmental Protection Science and  Technology Co., Ltd. is a collection of research and development, design, development, manufacturing, installation and debugging, operation and maintenance, after-sales service as an environmental protection equipment and accessories integrated manufacturing factory.


7.Successful Case
Product Tag:
Related categories:
Scroll to Top