The specially designed clamping ring and claw of the metal cable gland can force the nut and loosen the buckle, with a wide range of
clamping cables, strong tensile resistance, waterproof, and dustproof.Metal cable gland include metal Air vent plug,metal breathable
cable gland,metal multiple hole cable gland,metal screw plug,metal spiral cable gland.
Thread | Part No. | Cable Range (mm) | Thread O.D C1(mm) | G.L (mm) | Spanner Size A/F(mm) | Std.pkg (pcs/bag) |
M8*0.5 | M8-4.5 | 3-4.5 | 8 | 4 | 11/12 | 100 |
M10*1.0 | M10-6.5 | 3-6.5 | 10 | 6.5 | 14/14 | 100 |
M12*1.5 | M12-6.5 | 3-6.5 | 12 | 6.5 | 14/14 | 100 |
M12-8 | 4-8 | 12 | 7 | 14/17 | 100 | |
M14*1.5 | M14-8 | 4-8 | 14 | 7 | 17/17 | 50 |
M16*1.5 | M16-8 | 4-8 | 16 | 8 | 18/18 | 50 |
M16-10 | 5-10 | 16 | 8 | 18/20 | 50 | |
M18*1.5 | M18-10 | 5-10 | 18 | 8 | 20/20 | 50 |
M20*1.5 | M20-12 | 6-12 | 20 | 8 | 22/22 | 50 |
M22*1.5 | M22-14 | 10-14 | 22 | 8 | 24/24 | 50 |
M24*1.5 | M24-14 | 10-14 | 24 | 9 | 27/24 | 50 |
M25*1.5 | M25-14 | 10-14 | 25 | 9 | 27/24 | 50 |
M25-16 | 12-16 | 25 | 9 | 27/27 | 50 | |
M25-18 | 13-18 | 25 | 9 | 27/30 | 50 | |
M27*1.5(2) | M27-18 | 13-18 | 27 | 9 | 30/30 | 50 |
M28*1.5(2) | M28-18 | 13-18 | 28 | 9 | 30/30 | 50 |
M30*1.5(2) | M30-18 | 13-18 | 30 | 9 | 32/30 | 50 |
M32*1.5(2) | M32-22 | 15-22 | 32 | 10 | 35/35 | 50 |
M33*1.5(2) | M33-22 | 15-22 | 33 | 10 | 35/35 | 50 |
M36*1.5(2) | M36-25 | 18-25 | 36 | 10 | 40/40 | 50 |
M37*1.5(2) | M37-25 | 18-25 | 37 | 10 | 40/40 | 50 |
M40*1.5(2) | M40-30 | 22-30 | 40 | 11 | 45/45 | 50 |
M42*1.5(2) | M42-30 | 22-30 | 42 | 11 | 45/45 | 50 |
M47*1.5(2) | M47-33 | 25-33 | 47 | 11 | 50/50 | 50 |
M48*1.5(2) | M48-33 | 25-33 | 48 | 11 | 50/52 | 50 |
M50*1.5(2) | M50-38 | 32-38 | 50 | 13 | 55/57 | 50 |
M54*1.5(2) | M54-38 | 32-38 | 54 | 13 | 55/57 | 50 |
M60*1.5(2) | M60-44 | 37-44 | 60 | 14 | 64/64 | 50 |
M63*1.5(2) | M63-44 | 37-44 | 63 | 14 | 68/64 | 50 |
M64*1.5(2) | M64-44 | 37-44 | 64 | 14 | 68/64 | 50 |
M72*1.5(2) | M72-52 | 42-52 | 72 | 16 | 78/78 | 50 |
M75*1.5(2) | M75-52 | 42-52 | 75 | 16 | 78/78 | 50 |
M80*1.5(2) | M80-62 | 55-62 | 80 | 18 | 88/88 | 50 |
M88*1.5(2) | M88-70 | 65-70 | 88 | 18 | 94/94 | 50 |
M100*1.5(2) | M100-84 | 78-84 | 100 | 20 | 110/110 | 50 |
PG7 | PG7-6.5 | 3-6.5 | 12.5 | 6.5 | 14/14 | 50 |
PG9 | PG9-8 | 4-8 | 15.2 | 7 | 17/17 | 50 |
PG11 | PG11-10 | 5-10 | 18.6 | 8 | 20/20 | 50 |
PG13.5 | PG13.5-12 | 6-12 | 20.4 | 8 | 22/22 | 50 |
PG16 | PG16-14 | 10-14 | 22.5 | 9 | 24/24 | 50 |
PG19 | PG19-14 | 10-14 | 25 | 9 | 27/24 | 50 |
PG21 | PG21-18 | 13-18 | 28.3 | 9 | 30/30 | 50 |
PG25 | PG25-22 | 15-22 | 32 | 10 | 35/35 | 50 |
PG29 | PG29-25 | 18-25 | 37 | 11 | 40/40 | 50 |
PG36 | PG36-33 | 25-33 | 47 | 11 | 50/50 | 50 |
PG42 | PG42-38 | 32-38 | 54 | 13 | 57/57 | 50 |
PG48 | PG48-44 | 37-44 | 59.3 | 14 | 64/64 | 50 |
PG63 | PG63-52 | 42-52 | 72 | 16 | 78/78 | 50 |
NPT1/4 | NPT1/4 | 3-6.5 | 13.6 | 6 | 14/14 | 50 |
NPT3/8 | NPT3/8 | 4-8 | 17 | 8 | 18/18 | 50 |
NPT1/2 | NPT1/2 | 6-12 | 21.2 | 8 | 22/22 | 50 |
NPT3/4 | NPT3/4 | 13-18 | 26.5 | 9 | 30/30 | 50 |
NPT1 | NPT1 | 18-25 | 33.2 | 11 | 40/40 | 50 |
NPT1-1/4 | NPT1-1/4 | 25-33 | 41.9 | 13 | 50/50 | 50 |
NPT1-1/2 | NPT1-1/2 | 32-38 | 48 | 14 | 57/57 | 50 |
NPT2 | NPT2 | 37-44 | 60 | 14 | 64/64 | 50 |
NPT2-1/2 | NPT2-1/2 | 42-52 | 72.6 | 15 | 77/77 | 50 |
NPT3 | NPT3 | 65-70 | 88.6 | 15 | 94/94 | 50 |
Q1:.What is working time?
A:08:30-17:00 (GMT+8 Beijing), from Monday to Saturday.
24 Hours customerservice
For any query or problem , please contact us :
Q2: Will my drawing be safe after you get it?
A:Yes, we will not release your design to third party unless with your permission. And we
can sign the NDA before you send the drawing.
Q3: What is the MOQ?
A: Usually we don't set MOQ, but the more, the cheaper. Besides, we are happy to make
prototype or sample for clients to ensure quality standard.
Q4:Whether some samples can be provided?
A: Yes, We can supply the sample if we have ready parts in stock, but the customers have
to pay the sample cost and the courier cost.
Q5: What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products
and packages before you pay the balance.
Q6: How about your delivery time?
A: Generally, it will take 5-7 days after receiving your advance payment. The specific delivery
time depends on the items and the quantity of your order