Customized Environmental Steel Structure Building Stadium Construction Cost

Min.Order: 1
Product origin: Shenzhen, Guangdong, China
Infringement complaint: complaintComplaint
US$ 20 ~ 60

Description


Construction Cost Customized Environmental Protection Steel Structure Stadium Roof Building Cost

Product Description

 
Steel framework1.Steel beam
(Q235B,Q355B)2.Steel column
 3.Bracing
 4.H cross-section steel,box cross-section steel,round pipe,round steel,
 L steel,etc.
Wall and roof1.Single steel sheet 0.36mm-0.6mm thick
2.Sandwich panel with EP,PU,glass wool and rock wool(50-120mm)
Door1.Roller door
2.Sliding door and sidewall door
3.Steel sheet, sandwich panel or aluminum-alloy.
4.According to your requirements
Window1.Sliding window
2.Plastic-steel frame or aluminum frame
3.According to your requirements
Gutter1.Aluminum-zinc steel sheet
2.Stainless sheet
Downpipe1.PVC
2.Stainless pipe
Skylight panelFRP,1.5mm,2.0mm,2.5mm,according to your requirements
Ventilation1.Turbine vent
2.Ridge vent
3.According to your requirements
Other materialssSelf-screwing tapping,bolt,nut etc.


Factory photo

 

FAQ 

1. You are manufacture factory or trading company? 
We are manufacture factory. You are welcomed to visit us at any time. In the workshop, it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price. 

2. How about your quality control? 
Our products have passed CE EN1090 and ISO9001:2008. 

3. Can you offer design service? 
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project. 

4. What's the delivery time? 
The delivery time depends on the size and quantity of building. Generally within 30 days after receiving the payment. And partial shipment is allowed for big order.  

5. Do you offer service for installation? 
We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede. 

6. What's the payment term? 
30% deposit and 70% balance before shipment. 

7. How to get a quote from you? 
You can contact us by email, phone, TM, WhatsApp, Skype and so on 24*7 and you will get reply within anytime. 
Product Tag:
Related categories:
Scroll to Top