DRY BREAK COUPLERS DRY DISCONNECT COUPLINGS

Min.Order: 1
Product origin: Zhenjiang, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 400 ~ 500

Description
DESCRIPTION
DRY DISCONNECT COUPLINGS

SPECIFICATION
 
Dry Disconnect Couplings
Coupling MaterialStainless steelAluminiumBrass
Working Pressure25 bars (363 psi)10 bars (145 psi)16 bars (232 psi)
Test Pressure37.5 bars (544 psi)15 bars (218 psi)24 bars (348 psi)
O-rings SealFPM (-35°C / +140°C)NBR (-30°C / +100°C)/
Flat SealPTFE (-25°C/ +250°C)
End ConnectionsBSPP ,NPT ,ANSI 150 Lbs Flange
(Other Thread and Flangetypes on request.)
CertificatesATEX , PED , 3.1 Material certificate

APPLICATION
How our Dry Disconnect Couplings works?
1.Turning the Hose Unit by 15° clockwise locks the units together.
2.The valves are still closed
3.Turning the Hose Unit by 90° opens the inside valves.
4.To close the valves and unlock the Units, reverse the process.

FEATURE
1.Safety First!
Our Dry Disconnect couplings are designed to protect the operators and the environment during the loading and unloading fluid process. The bidirectional sealing design ensures a safe and simple disassembly process.

2.Solutions.
We can supply a large range of material and sizes.

3.Multi-Brands compatibility.
Our Dry Disconnect Couplings are designed according NATO STANAG 3756 this allows us to be compatible with most brands.


ADVANTAGE
1. Avoid the loss of fluids during locking and unlocking connection process.
2. Reduce the possibility of Human error in fluid transfer operation (mixing products)
3. Ease of handling
4. Protect the Human health
5. Protect the Environment

PRODUCT SKETCH

CERTIFICATES
ATEX                                                                                             PED
 
SIZE
DDC-HOSE UNIT
ModelSize(mm)ThreadCodeThreadCodeMaterial
TH561''BSPP ISO 228-1"L1601087NPTL1601051SS 1.4408
TH702''BSPP ISO 228-2''L1601026NPTL1601099SS 1.4408
TH1052-1/2''BSPP ISO 228-2-1/2''L1601005NPTL1601104SS 1.4408
TH1193''BSPP ISO 228-3''L1601057NPTL1601114SS 1.4408
TH1644''BSPP ISO 228-4''L1601018NPTL1601115SS 1.4408
TH2386''BSPP ISO 228-6''L1601182NPTL1601183SS 1.4408
TH2728''BSPP ISO 228-8''L1601218NPTL1601219SS 1.4408
 
TH561''BSPP ISO 228-1"L1601168NPTL1601166BR
TH702''BSPP ISO 228-2''L1601068NPTL1601154BR
TH1052-1/2''BSPP ISO 228-2-1/2''L1601069NPTL1601170BR
TH1193''BSPP ISO 228-3''L1601129NPTL1601070BR
TH1644''BSPP ISO 228-4''L1601137NPTL1601071BR
TH2386''BSPP ISO 228-6''L1601206NPTL1601207BR
TH2728''BSPP ISO 228-8''L1601214NPTL1601215BR
 
TH561''BSPP ISO 228-1"L1601097NPTL1601046AL
TH702''BSPP ISO 228-2''L1601047NPTL1601106AL
TH1052-1/2''BSPP ISO 228-2-1/2''L1601145NPTL1601146AL
TH1193''BSPP ISO 228-3''L1601113NPTL1601116AL
TH1644''BSPP ISO 228-4''L1601050NPTL1601081AL
TH2386''BSPP ISO 228-6''L1601202NPTL1601203AL
TH2728''BSPP ISO 228-8''L1601210NPTL1601211AL
 
DDC-TANK UNIT
ModelSize(mm)ThreadCodeThreadCodeMaterial
TU561''BSPP ISO 228-1"L1601093NPTL1601171SS 1.4408
TU702''BSPP ISO 228-2''L1601032NPTL1601152SS 1.4408
TU1052-1/2''BSPP ISO 228-2-1/2''L1601044NPTL1601103SS 1.4408
TU1193''BSPP ISO 228-3''L1601034NPTL1601111SS 1.4408
TU1644''BSPP ISO 228-4''L1601024NPTL1601112SS 1.4408
TU2386''BSPP ISO 228-6''L1601178NPTL1601179SS 1.4408
TU2728''BSPP ISO 228-8''L1601216NPTL1601217SS 1.4408
 
TU561''BSPP ISO 228-1"L1601167NPTL1601165BR
TU702''BSPP ISO 228-2''L1601064NPTL1601159BR
TU1052-1/2''BSPP ISO 228-2-1/2''L1601065NPTL1601169BR
TU1193''BSPP ISO 228-3''L1601134NPTL1601066BR
TU1644''BSPP ISO 228-4''L1601142NPTL1601067BR
TU2386''BSPP ISO 228-6''L1601204NPTL1601205BR
TU2728''BSPP ISO 228-8''L1601212NPTL1601213BR
 
TU561''BSPP ISO 228-1"L1601098NPTL1601039AL
TU702''BSPP ISO 228-2''L1601001NPTL1601002AL
TU1052-1/2''BSPP ISO 228-2-1/2''L1601040NPTL1601102AL
TU1193''BSPP ISO 228-3''L1601041NPTL1601117AL
TU1644''BSPP ISO 228-4''L1601042NPTL1601083AL
TU2386''BSPP ISO 228-6''L1601200NPTL1601201AL
TU2728''BSPP ISO 228-8''L1601208NPTL1601209AL
 
 
Quality Assurance and Service
1. Have a complete rigorous management, production and inspection processes to control the quality and avoid detail mistake
2. Design and produce ability
3. Rigorous inspection including incoming inspection, flaw detection etc., and double check is a must.
4. Advanced factory facility ensure
5. Response to any inquiry within 24 HRS with design or efficient solution from our engineer or tech supporter.
6. Provide professional customization service according to client's requirements
7. on time delivery, as we have rigorous production schedule and profession follow-up process
8. Moderate price and professional service
 
Welcome to your inquiry!
 
 
Product Tag:
Related categories:
Scroll to Top