Concrete Forming Accessories Formwork Turnbuckle Wall Braces
for Steel Ply Formwork System
The turnbuckle section of the aligner features a 1" diameter self-cleaning coil thread for fast
adjustments. Overall length of the aligner is 35" minimum and 39" maximum, offering 4" of
effective adjustment. Turnbuckle Form Aligner has a bent nailing plate equipped with nail
holes for nailing to forms and a 15/16" hole to accept 3/4" or 7/8" round steel stakes when
using the bracket from the ground up. Aligners can be used repeatedly when cleaned of any
concrete after use. The safe working load of the aligners is limited by the lumber, nailing,
and/or staking methods.
Product Name | Picture | Type | Weight | |
g | LBS | |||
Turnbuckle Form Aligner Standard | Flat Plate | 3528 | 7.7778 | |
Bent Plate | 3628 | 7.9982 | ||
Turnbuckle Form Aligner Heavy duty | Flat Plate | 3710 | 8.1790 | |
Bent Plate | 3810 | 8.3995 |
Plywood Forming Concrete Snap Tie /Jahn A Bracket/Wedge
Snap Ties are manufactured with integral heads and Metal or Plastic Form Spreaders.
Snap Ties are designed to easily tie lumber forming systems. Snap Ties have a nominal
1" break-back. Each Tie incorporates an anti-turn device in order to properly break after use.
Long End, Short End, and Odd End Snap Ties are used with wedge and janh clamp for
plywood forming. Available with 1″ x 1″ cones (plastic), washers (metal), and water-resistant
seal options.
1. Quality: Strictly control the quality through three levels. First level, quality test on the producing line.
Second level, quality test during warehousing. Third level, quality test before loading.
2. Timeliness: 24 hours online. Provide consulting and quotation services for customers all the time.
3. Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's
requirement.
4. Integrity: If the customer complains about the quality of the products, our company will actively
cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the
corresponding responsibility and compensation.
5. Longevity: Establish good long-term relationship with customers.
TRICO was founded in 2002. As an expert in the field of formwork and scaffolding,
TRICOis committed to providing better products and services to customers in the global
construction industry.
TRICO has a wide range of product lines, including the production and supply of full
system of building formwork, scaffolding and related components, and has realized
the "1+N" one-stop service mode. Theproducts sell well in more than 90 countries
and regions, winning the recognition and trust of business partners around the world.
TRICO's R&D team is experimenting and optimizing products every day. The endless
improvement and perfection is the gene of TRICO culture. TRICO's mission is to promote
the quality improvement, cost reduction and environmental protection and efficiency
enhancement of global buildings.
Let's work together to make it easier to build houses anywhere in the world!