Model | Main motor power | Output | Size |
SR100 Single colour | 30kw | 80-100kg/h | 25000x4500x2500mm |
SR100 Double colour | 30kw | 100-200kg/h | 25000x4500x2500mm |
Main Accessories | Function |
Anti-blocking feeder | Makes sure the even feeding and stable discharge of materials. |
Double shaft preconditioner | Enables the materials stay longer in the preconditioner and evenness in precondtioning, improves the precure degree and increases the capacity. |
Gearbox | Processed by internationally advanced process technology, ensuring the machines run in long time without malfunction. |
Lubrication and cooling system | Adopts refined filtration forced cooling, creating best working conditions for the bearings. |
The feeding system | Adopts double spiral forced feeding, feeding uniformly and widely. |
The screw | Segmented combined screw, suitable for a wide range of raw materials. With self-cleaning function. |
The rotary cutting device | Adopts a suspended mold (knife) assembly and a linear bearing tool adjusting device to adjust the tool safely, accurately and quickly. |
Name | Pet snack cutting machine |
Output | 120kg/h |
Power | 1.5kw |
Size | 1600X800X1300mm |
Function | The machine USES the servo motor to make the cutting tool realize the instantaneous speed and make the incision. |
a.) Free consultation service before, during, and after sales;
b.) Free project planning and design services;
c.) Free debugging of equipment until everything is functional;
d.) Free management of equipment long distance shipping from seller's factory to named place by buyer;
e.) Free training of equipment maintenance and operating personally;
f.) Free new production techniques and formulas;
g.) Provide 1 year complete warranty and life-time maintenance service; All spare parts and wearing parts are attached with the machinery for free.
1. Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check it.
2. Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shippment after inspection.
3. Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
4.Q: If the power supply is not 3ph 380V 50HZ, could you offer the suitable machine?
A: Yes, we can offer the suitable machine according to your power supply, for example 3ph 380V 60HZ, 3ph 415V 60 HZ, 3ph 220V 60HZ and so on.
5.Q:Do you supply packing machine?
A: We have long-term cooperation packing machine supplier, we will help to contact them.