Outside Dimension (mm) | 18156*6906*5800(L*W*H) | Inside Dimension(mm) | 18000*5000*5000(L*W*H) |
Front Door(mm) | 4000*4500(W*H) | Service door (mm) | 800*2000(W*H) |
Total Power | 98KW | ||
Cabin system | Wall panel | 75mm EPS sandwich panel, steel sheet thickness: 0.6mm | |
Ceiling panel | 50mm rock-wool panel. | ||
Windows | 4mm safety tempered glass | ||
Air Make-up System | Air Inlet fan system | 6*7.5kw centrifugal belt-drive fan, proof-explosion motor. | |
Exhausted fan system | 3*15kw centrifugal belt-drive fan, proof-explosion motor. | ||
Ai capacity for fresh air | 22000m3/h *6 | ||
Air capacity for exhausted air | 19500m3/h *3 | ||
Air Flowing speed | 0.25m/s in empty booth | ||
Air Control method | One manual damper for exhausted system | ||
Exhausted ducting | 6meters straight ducting, one 90°elbow for each unit fan system. | ||
Purification System | Pre-filter | G3 grade | |
Ceiling filter | EU5 / F5 | ||
Floor filter | green fiber glass filter / G3 grade | ||
Exhausted fan Filters | M green fiber glass filter. | ||
Heating System | Heat Exchanger | SUS304 material, argon arc welding. | |
Heating burner: | 3 sets Riello RG5S diesel oil burner(gas burner for option) | ||
Heating productivity | 260000Kcal/h/ burner | ||
Spray to baking switch | 20N BELIMO brand electrical damper | ||
Chimney ducting | 6 meters stainless ducting for each heating system | ||
Max heating temperature | 80degrees | ||
fuel consumption | 10-15L /vehicle | ||
Lighting System | Ceiling lights | 22 Units, each 4 x 36W lamps, Total 3312 W | |
Side lights | 26 Units, each 2 x 36W lamps, Total 1872 W | ||
Illumination | 900LUX | ||
Controlling system | Micro-computerized programming system | Spraying & baking switch, lighting switch, emergency stop, breakdown alarm, failure alarm, pressure gauge |
Q: Which Port of loading?
A: Mainly ship from Ningbo port / Shanghai Port/Guangzhou Port.
Q: What is your MOQ?
A: All the products can be mixed in one container with low MOQ 1pcs.
Q: What is the Lead Time?
A: Normally it needs 20-25 days.
Q: What is the Payment Terms?
A: T/T/ 30% deposit before production and 70% before delivery.