ODM Automatic 230V Input Voltage Drying Machine Chemical Dehumidifier

Min.Order: 20
Product origin: Hangzhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 289 ~ 349

Description
Features

- Large handle and big wheel design.

- Electrical humidity control, with humidity display.
- Humidity 1% adjustable, precise control.
- Electronic defrost control, high performance.
- Auto-memory function, restore to previous setting after power back on.
- Auto-detect faulty function.

 
Unit Display

Company Profile

 



Zhejiang Preair Electric Appliance Industry Co., Ltd. Established in 1998 and over 20 years dedicated on dehumidification industry.

- Nearly 30, 000m² Production area in Jiande City, 160km far away from Hangzhou, The capital of Zhejiang, China.

- Main Business is R&D, producing and sales Dehumidifiers, especially commercial and Industrial Dehumidifiers.

- Total 180 employees, 18 professional engineers, 135 blue workers, 37 admnistative and sales.


 
Product Description

 

Industrial DehumidifierPR50
Capacity@30/80%RH[l/24h]50L/D
Power Supply230V/50Hz/1PH
Power Consumption700W
Rated Current3.2A
RefrigerantR290/0.23kg
Recommend Room Size200m2
Control TypeLCD
Auto DefrostYes
Water Pumpoptional
Products Dimension(W*D*H)605*462*915mm
Kwh CounterYes
TimerYes
Production Capabilities

 

Packaging & Shipping

 

Certifications

 




 

FAQ

 

Q: Are you a trading company or manufacturer?
A: We are one of China's leading manufacturer of commercial and industrial dehumidifier. We established Hongtai in 1999, by a group engineers with over 20 years experience in the cooling. Currently our workshop covering 33000m2 within five advanced semi-automatic machine assembling lines.

Q: Do you accept OEM & ODM?
A: Yes.

Q: Can I buy a sample for testing
A: Of course. For most of the models, we have them in stock. we can supply you with the sample within 7 days after we get your payment.

Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou City. You can take the airplane to Shanghai, then take the fast train for 50 minute to Hangzhou railway station, we can pick you up at the railway station. If you fly to Hangzhou directly, we can pick you up at the airport.

Q: What is the delivery time for bulk machine?
A: Normally, it is 45 days for first delivery, second is 40 days after receive your deposit.

Product Tag:
Related categories:
Scroll to Top