Injection Open Face Helmet Mold/Mould Manufacturer

Min.Order: 1
Product origin: Taizhou, Zhejiang, China
Infringement complaint: complaintComplaint
US$ 20000 ~ 30000

Description
Plastic motorcycle helmet mould
1. Provide 3D design
2. Mould Steel and hardness: 718 (HRC34-38)
3. OEM service
4. Mould life: 500, 000shots

JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- checking each part of mould's size after machining, according to 2D drawing

- mould testing(check mould running condition)

3. Check with customer's requirement again before mould shipping.
Product NameInjection Open Face Helmet Mold/Mould Manufacturer
Product materialABS
Core&Cavity Steel718
Steel hardness:HRC34-38
Mould StandardDME
Cavity Number1*1
Injection SystemPoint Gate
Ejector SystemEjector pin
Cycle Time35S
Tooling lead time60DAYS
Mould life500,000SHOTS
Quality assuranceISO9001
SpecificationAccording to client's requirements

 

 
Our Advantage    1.High quality
   2.Reasonable price
   3.On time delivery
   4.Good After-sale service
   5.Strict quality control
   6.All the mould are automotic.

 

 
Offer youIn-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.

Plastic food box mould
1.Samples/Drawing &Requirement from you
2.Mould design:we will Communicate&Exchange the opinion with you after you place order.
3.Material Purchase:Steel cutting and Mould base tooling.
4.Assembling.
5.Inspection of mould : following and controlling the tooling processing.
6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!
7.Your instruction &confirmation for shipment.
8.Ready made mould before packing.

 

 
For more information please contact us.
FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.















Product Tag:
Related categories:
Scroll to Top