Description

General information

The system is especially designed for testing GIS in the factory and on-site test, and for testing all GIS switchgears and GIS components such as insulators, insulating tension pole, GIS PT etc. It also can test transformers, power cables.
As its good encapsulation, it can perform PD test in normal environment. When it tests partial discharge, the PD level is less than 3pc, and it can be added a HV bushing to perform the withstand voltage test at the same time.
 

Features

1. Small and compact dimensions resulting in minimum space requirements.
2. Light weight. Rugged construction to withstand long transportation stresses.
3. Direct flanging to the test object.
4. High safety because of encapsulation of all HV parts .
5. Large range of application in conjunction with HV bushing for withstand voltage test.
6. Built-in HV measuring capacitor and coupling capacitor.
7. Built-in HV disconnecting switch to separate multipath test object connector to ensure the safety of HV testing.
8. Error calibration of PT or CVT can be made by this system.
9. Partial discharge simulation test system can be customized for PD research.

Basic configuration
Cylinder type voltage regulator (Frequency variable power source used in the GIS voltage transformer test system)
Isolation transformer
Compensating reactor
SF6 HV testing transformer
Capacitive divider
Basic interface
Control system


Optional Configuration
Coupling capacitor
Partial Discharge detector
SF6 HV bushing and disconnecting switch
Various connection or adaptation flanges according to different test objects
Universal adjustable platform for testing GIS switchgear
Standard voltage transformer(Only for GIS HV testing system)


Function of the testing system
1.The encapsulated test transformer is a conventional transformer and step-up the voltage coming from the voltage regulator. The compensating reactor connect with the HV transformer primary winding to compensate the capacitive current. (The HV transformer LV side has an independent compensating winding.)
2.For the on-site testing system, the voltage regulator, compensating reactor, Isolating transformer and control system are integrated into a cabinet. It gives a most compact equipment with a minimum number of components to be transported and connected for testing.
3.Using HV disconnecting switch to disconnect all types of test object connector to achieve widely use.
4.Three-phase change-over switch to test three phase in box system.
5.Universal adjustable platform to make HV transformer flange test object more conventional.

Ambient conditions for testing system

AltitudeNot limited for the HV parts
Relative humidityNot limited for the HV parts
Ambient temperature-10°C-40°C
Grounding system≤2Ω
Supply voltageSine wave
Wave distortion<3%


 