Protective Black Welding Industrial Plastic PVC Strip Curtain Screen for Welding Area

Min.Order: 20
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 40 ~ 42

Description
Introdution
Black PVC Strip curtain is used as welding PVC Strip Curtain. Welding PVC strip curtain designed to protect individuals from ultraviolet radiation, sparks, and spatter. Great for traffic areas where need to be accessed regularly but still require protection. Appropriate eye protection must still be worn. It will help protects workers from Welding area, Flash burns and UV light.






Colors
Clear, Pale Green, Pale Blue, Yellow, Dark Bronze, Dark Green, Ultra Violet Red and so on.

Style
Smooth, Double Ribbed

Standard Sizes
2mmX200mmX50m; 2mmX300mmX50m;
3mmX200mmX50m; 3mmX300mmX50m; 3mmX400mmX50m
4mmX300mmX50m; 4mmX400mmX50m
Performance TestMethod:
B S 2782
PVC strip curtain
Standard  Clear Formula
P.35 Value
PVC strip curtain
Super  Cold Formula
P.45 Value
Unit
Relative DensityDIN 53 479~1.22~1.19g/cm3
Softness A HardnessDIN 53 5057763-
Brittle PointDIN 53 372Approx -35Approx -45Degrees C
Falling Ball TestInternal Test"-35 No Break"-45 No BreakDegrees C
FlexibilityDIN 51 949"-35 No Break"-45 No BreakDegrees C
Water AbsorptionDIN 53 4721721Mg
Tensile StrengthDIN 53 4551713Mpa
Tensile StressDIN 53 455300420%
Rupture ResistanceDIN 53 515>5>2N/mm
Reaction to FireDIN 53 382Self-extinguishingSelf-extinguishing0
FlammabilityBased US MV SS 302InflammableInflammable0
Airborne InsulationDIN 52 210~30 dB00
Light Transmission->80>80%
FAQ 

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM/ODM manufacturer factory with export license. We have an outstanding and experienced team made up of "A" player who have a passion for doing something great to create more value for customers world-wide.
 
 
2. Question :  Why choose cooperate with us ? 
Answer :  -- Right people, Right product, Right price ;
                -- Company-wide customer awareness ;
                -- Reliable Quality and All components from world leading suppliers ;
                -- Cost-effective export infrastructure and total supply chain management ; 
 

3. Question : Where is your factory located ?  How can I visit there ?   
Answer: With an ISO90001 certified factory located in hebei Province , P.R. China . It takes about 2 hours from BEIJING by car. It is very pleasure for clients to visit us. 
 

4. Question :  Can you do OEM ? 
Answer :  Yes, we have the ability to do OEM / ODM to meet clients' requirements. 
 

5 Question :  How can I get some product samples ? 
Answer : We are honored to offer you good product samples. New clients are expected to pay for the product sample cost and the international transportation cost. Product Sample cost would be deducted from the customers' next mass production purchase order in future.  
 

6. Question : How does your factory do regarding quality control ? 
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 
 
7. Question : What is the average delivery time ? 
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 

: With an ISO90001 certified factory located in hebei Province , P.R. China . It takes about 2 hours from BEIJING by car. It is very pleasure for clients to visit us. 
 

4. Question :  Can you do OEM ? 
Answer :  Yes, we have the ability to do OEM / ODM to meet clients' requirements. 
 

5 Question :  How can I get some product samples ? 
Answer : We are honored to offer you good product samples. New clients are expected to pay for the product sample cost and the international transportation cost. Product Sample cost would be deducted from the customers' next mass production purchase order in future.  
 

6. Question : How does your factory do regarding quality control ? 
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 
 
7. Question : What is the average delivery time ? 
Answer : Most of the time, it would be around 1 week since after confirm receiving customers' contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case. 


Product picture








Packing









Product Tag:
Related categories:
Scroll to Top