Heavy Duty Warehouse Storage Cantilever Rack

Min.Order: 1
Product origin: Dongguan, Guangdong, China
Infringement complaint: complaintComplaint
US$ 310 ~ 377

Description
Heavy Duty Warehouse Storage Cantilever Rack

 Techincal details of cantilever rack 1000KG per cantilever arm:
Stylelong items storage, lumbers, aluminium profile storage

Plywood storage, steel tubes, wooden crates storage

Main Components
1, Vertical column( adjusted pitch of 140mm)

2, Column basis( W300*45/45mm)

3, Cantilever arm( Hanger 150mm)

4, connector/ "x" connector between columns

Components structure
1, vertical column: C/C tubes welded H4080MM

2, column basis: C/C tubes bolted

3, cantilever arm: bended plate with hanger
Component ranges1, vertical column: 300*90( 45+45mm)

2, Column basis: 300*45
ThicknessColumn/basis/cantilever arm: 2.0mm~4.0mm

Connector: 1.5~1.8MM
Cantilever arm length1000MM(1000KG laden)

( the shorter of arm, the stronger loading on each arm)
Column lengthCantilever arm length + extra 400~500MM
MOQ2 units
The width between columnsL1100MM

( narrow space will make stronger loading on cantilever )
MaterialMade of Q235B steel
Lead time25~30days( regardless of purchase quantities)
Stock We donot have any stock for cantilever rack system

( all sizes are made purpose/perosnal-designed)
ColourRAL 5015( blue) + RAL 2004(Orange)
 

Basic structure of heavy duty cantilever rack units:






 
(Our Services)

Business scope within Sunli Company
Pallet storageWarehouse RackDouble deep pallet rack
Radio shuttle rackDouble deep pallet rack
AccessoriesLong span shelving rackMezzanine Rack System
Long itemsCantilever  rackStackable Pallet Rack




Please inform us following information to get prompt offer for cantilever rack system

+  The dimensions of single rack unit ( or palletized load descriptions)

+  The palletized payload

+  Row of racks(  single row, back-to-back row or multiple rows)

+  How many palletized load within one unit

( Please refer to the Product Description on the top)

 FAQ
1, What is MOQ limitation for cantilever rack system
?

++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that  production can be better handled.

2, What is the lead time in Sunli?
++ As per 20FT container loading, manufacture time is about 21days; Regarding some customized items 25~27days will be covered.

3,  What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.

4, How about Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.

5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.







Scroll to Top