Basic information:
Brand | Moldie |
Mold Base | LKM C50 + P20 for AB, Cast iron etc. |
Inserts(cavity and core) | Dievar, H13, 8407, 1.2344 or the material you required |
Standard | HASCO, DME, MISUMI, PUNCH and so on |
Product Material | ADC12, ADC14, A360, A380, AlSi9Cu3 and so on |
Mold Treatment | Heat Treatment >HRC45 |
Product Surface | Sand blasting, Powder coated, Painting, Anodizing, etc |
Shape & Color | Can be design according to your needs |
Process | High Pressure Die Casting |
Certificated | ISO 9001:2015 Certificated |
Trade information:
MOQ | 1 set |
Mold lead time | T1 sample, about 3-10 weeks, according to the mold requirement |
Production lead time | 2-5 weeks, according to the order Qty |
Mold payment term | 50% T/T deposit with PO, balance 50% T/T after sample approved |
Products payment term | 30% T/T deposit with PO, balance 70% T/T before shipment |
Port of loading | Ningbo or Shanghai port |
Some pictures of our die casting parts:
MOLDIE provides service of part design, prototype making, mold design, mold production, mass production and assembly service in house. We are cooperating with many clients all over the world and have a deep understanding of the mold industry, our experience range from simple design to challenging technical parts.
Q: Can you make the production mold with short run production? |
A: Yes, we can. We can make the production for any quantity you want. |
Q: How do we control the mold processing? |
A: We will send the processing report and mold processing picture every two weeks to the customer. |
Q: Are the samples free of charge? |
A: Yes, the first trial samples(5-10pcs) is free, and we will send you the sample by DHL, FEDEX or TNT as soon as we finish the first samples. |
Q: Who own the mold? |
A: Customer. |
CONTACT US | BACK TO HOMEPAGE |