High Speed Tissue Paper Making Machine Mills, Toilet Production Line (2400mm)

Min.Order: 1
Product origin: Jiaozuo, Henan, China
Infringement complaint: complaintComplaint
US$ 150000 ~ 200000

Description
Technical parameter of tissue paper making machine:
Adapt pulp: Waste paper, finished pulp
Output paper: High and middle grade tissue paper
Output weight: 13-40G/M2
Net paper width: 2400mm
Wire width: 2850mm
Capacity: 10T/D
Working speed: 150-200m/min
Rail gauge: 3200mm
Drive: AC converter frequency conversion, adjustable speed, drive step by step
NO.EquipmentQty(set)
12400mmsingle cylinder single wire & single felt high speed tissue paper machine1
2Double layer exhaust hood1
3axial-flow fan1
4Sealed pressure cylinder vat1
515 type roots vacuum pump1
6Suction box2
78m 3 High consistency hydrapulper1
82M2 High frequency vibrating screen2
935 m 3 bleacher6
10380 double disc refiner3
11Φ 700 thruster8
12CX0.9 centrifugal screen2
13606 desander 10pcs2 groups
14Two-phase flow pump-1006
15Two-phase flow pump-1508
162400mmrewinding & perforating machine1
17Cutting machine   1
18Sealing machine1
18Pump cabinet     1
19Frequency control cabinet1
202T boiler(coal/gas)1
 raw metarial can be tree ,reed ,cotton,bamboo,bagasse,wheat straw,
and all kinds of wasted paper 
many spare parts will be free!!!!!!


machine detail

 

packaging: products will packaged according to their shapes, weight, transport distance and transport modes. large machines will be packaged in sections. every part of export machinery will be in standard export package-seaworthy wooden case, waterproof film, straw rope, carton box etc., which will ensure the intactness of products.

transportation: products will be transported according to their features and clients's needs. air, train and sea transportation are all available.


Perfect service : 

1. Before sales service : 

1) We supply complet consultating service ,we will check your requirement and your current situation and supply professional advice and make exact offer accordingly ; 

2) we will supply detail project evaluation report and feasibility report according to your 
situation and factory 
condition ; 

3) we will make factory design according to your factory condition or land condition ; 

2.after sales service : 

1) we will send engineer to make intallation ; 

2) after installation , we will keep engineer working for you , the engineer will teach your
 worker how to
 operate ,maintain machine ; 

3) we will supply spare part ; 

 

4) when the machine normal working, any questions about this production line , seller must reply within 24hours and work out them within 48hours ,if necessary ,seller will send engineers to buyer's factory ;


 

company information

1.Following is main introduction of our company : 

(1) total area of factory : 20,000m

(2) total qty of workshop : 4 ; 

(3) workers : 110 workers ; 

(4)engineer qty : 25 engineers ; 

2.Why you choose us ? 

(1) professional engineer team with 30years experience ; 

(2) we can supply you turn -key solution without any trouble ; 

(3) we have strict quality control system and ensure there is no unqualifiedly product ; 

(4) professional installation technician and clear technical training for your workers ; 

(5) strict recalling system : if any problem of machine ,we will recall it and change a new one for free ;  

 

1.Following is main introduction of our company : 

(1) total area of factory : 20,000m

(2) total qty of workshop : 4 ; 

(3) workers : 110 workers ; 

(4)engineer qty : 25 engineers ; 

2.Why you choose us ? 

(1) professional engineer team with 30 years experience ; 

(2) we can supply you turn -key solution without any trouble ; 

(3) we have strict quality control system and ensure there is no unqualifiedly product ; 

(4) professional installation technician and clear technical training for your workers ; 

(5) strict recalling system : if any problem of machine ,we will recall it and change a new 
one for free ;  

part of our successful production  line


 

FAQ

1.Payment terms : 

(1) 30% T/T within 10days after sign contract; 

(2)70% T/T before shipment ; 

(3) 100% L/C is also acceptable ; 

2.delivery time : within 50days after first payment ; 

3.design , installation and training workers : 

(1) After client confirm machine model , we will make design completely 
according to client
's technical

 requirement and land condition ; 

(2) After shipment , we will send engineer to make installation and test machine ; 

(3) After installation , we will keep 1-2 engineers working for client , these
 engineer will
 teach worker 

how to operate ,maintain machine ; 

4. Turn- key project : 

We can accept turn-key project ; 

5.OEM : 

We can accept OEM ; 

 

 If you interest our product ,please send us a inquiry for having  a better understanding 

about paper-making .,And I 'd love to serve you !


 


if you scan the whole pag ,but you don't get the information you want to know,you can also
contact 
us to tell uswhat you want to learn aboout paper machine when you browse web
pag though the above ways.
only in thisway can we both have  a further understanding
about paper machine,and we can 
provide you customers  a detailed and comprehensive
understanding about paper making in the 
near future,we will treat your advice seriously.

Product Tag:
Related categories:
Scroll to Top