Tipo de manguera | El D.I. | El D.E. | W.P | B.P | B.R | W.T | |||
Dash | Pulg. | Mm | Mm | MPa | PSI | MPa | PSI | Mm | Kg/m |
R3-04 | 1/4 | 6.3 | 12.6 | 10.5 | 1523 | 42 | 6090 - | 75 | 0,145 |
R3-05 | 5/16 | 7.9 | 14.1. | 8.7 | 1262 | 35 | 5075 | 75 | 0,182 |
R3-06 | 3/8 | 9.7 | 16.8 | 8.4 | 1218 | 34 | 4930 | 100 | 0.253 |
R3-08 | 1/2 | 12.7 | 18.4 | 7.8 | 1131 | 31 | 4495 | 100 | 0,282 |
R3-10 | 5/8 | 15.8 | 23.0 | 7.0 | 1015 | 28 | 4060 | 125 | 0.416 |
R3-12 | 3/4 | 19.0 | 26.7 | 6.1. | 885 | 24 | 3480 | 140 | 0.499 |
R3-14 | 7/8 | 22.3 | 31.0 | 5.2 | 754 | 21 | 3045 | 150 | 0.697 |
R3-16 | 1 | 25.4 | 37.5 | 3.9 | 566 | 16 | 2320 | 205 | 0.844 |
R3-20 | 1.1/4" | 31.8 | 45.0 | 2.6 | 377 | 10 | 1450 | 250 | 1.004 |
Los detalles de embalaje :
1. Colorida cinta de nylon envolviendo las bobinas
2. El mar transparente de PVC cinta digna de las bobinas envuelto
3. Tubo de plástico los tambores
4. Manguera de madera los tambores
5. Palets con bobinas de manguera
6. Caja de madera con bobinas de manguera
Los detalles de envío :
1. Menos de 1.000 metros se entrega dentro de 7 días.
2. Menos de 5.000 metros se entrega dentro de 10 días.
3. Menos de 10000 metros se entrega dentro de 15 días.
4. Un contenedor completo será la entrega dentro de 30 días.
Q: ¿Eres empresa comercial o el fabricante ?
R: Estamos en la fábrica.
P: ¿Cuál es su hora de entrega?
R: Generalmente es de 5-10 días si la mercancía en stock. o es de 15-20 días si las mercancías no están en stock, es según
La cantidad.
P: ¿proporcionar ejemplos? Es libre o extra ?
R: Sí, podríamos ofrecer la muestra de gratis, pero no pagar el costo de flete.
P: ¿Cuál es su condiciones de pago ?
R: El pago<=1000USD, el 100% por adelantado. El pago>=1000USD, el 30% T/T de antemano ,saldo antes de envio.