5 1/2" Bottom and Top Cementing Plug /API Cement Plug

Min.Order: 1
Product origin: Dongying, Shandong, China
Infringement complaint: complaintComplaint
US$ 10000-80000 $US

Description

 5 1/2" Bottom and Top Cementing Plug /API Cement Plug
Bottom and top cementing plug /API cement plug/drilling cementing plug

Product Description
 5 1/2" Bottom and Top Cementing Plug /API Cement Plug
Bottom and top cementing plug /API cement plug/drilling cementing plug

a.Special non-rotational device design allowing the plugs to drill out quickly;

b.Special materials designed for easy drill out with PDC bits;

c.High temperature and high pressure resistance.

Cementing Plugs from high-performance special elastomers and core materials. These Cementing Plugs are specially designed with a positive wiping action to ensure that the casing is clean.

Bottom Plugs:Like the Top Cementing Plug, the fins and tail section provide positive wiping action. Fins also serve as a seal while cementing. The core of the bottom plug also made of special materials such as Plastic, Aluminium or Phenolic depending on the application and well conditions. A rubber diaphragm at the top of the plug ruptures after the plug is seated allowing cement to flow through.

Top Plugs:The Top Cementing Plug is designed to exert continuous pressure on the casing wall. The core is made of special materials such as Plastic, Aluminium or Phenolic depending on the application and well conditions. The tapered base fits the cavity of the top plug initiating a positive seal. A solid rubber top plug is also available.

 5 1/2" Bottom and Top Cementing Plug /API Cement Plug

Detailed Photos


Packaging & Shipping

 



 

 5 1/2" Bottom and Top Cementing Plug /API Cement Plug
FAQ

 

FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
Product Tag:
Related categories:
Scroll to Top