Sanitary Faucet Nickel Chromium PVD Gold Coating Plating Machine Equipment

Min.Order: 1
Product origin: Guangzhou, Guangdong, China
Infringement complaint: complaintComplaint
US$ 8 ~ 88

Description
Sanitary Faucet nickel chromium PVD gold coating plating machine equipment
 

The machine is mainly design for sanitary ware/bathroom fitting parts. It's equipped with several big size electrical arc evaporation sources and magnetron sputtering coating system, to deposit high performance metal decorative film on brass, zinc alloy, stainless steel, plastic and other metal parts surface. It can get all types of metal color series on substrate. The coating film includes TiN, Zr,T iCN, ZrCN, CrN, CrCN, brass, bronze, chrome etc. Color series includes AF, SN, BN, VF, BV, G, BX, TB, AF, SN, 96CB, CB, TXB, VS, S, BS, BRZ, BGD, PGD and so on. It can get different colors by adjusting coating technics. It is largely used in the sanitary ware/ Kitchen ware field. 



Coating film performance:
(1) The coating is uniform, dense, with good adhesion, high hardness and low friction factor.
(2) The color does not fade over 2-3 years, which can meet the ROHS environmental standard.
(3) High physical property, good abrasion resistance; non-stick dirt on the surface of the coating.
(4) Stable performance, perspiration resistance/salt mist/abrasion/bend/RCA are all qualified.

 

Benefits of PVD 

 Increase life span of the PVD coated products
 Corrosion resistance
 Chemical resistance
 Wear resistance
 Friction resistance
 Superior Decorative finish
 Uniform coating
 Low maintenance cost
 Environment friendly
 Will not tarnish / fade
 Re coating possible at a high quality level





We developed a complete after-sales system and effective service measures. Company now owns a professional after-sales service team with more than ten experienced engineers.

ISO 9001 standard to ensure the quality can meet the customer's requirements.

Easy to implement

To many people unfamiliar with the process, PVD coating technology seems complicated. However, with the right investments and a good support, it is easier than expected. HCVAC has developed a turnkey coating process that makes a PVD coating centre easy to implement. A complete coating process consists of several steps: Stripping (depending on the part's history); Pre-treatment; Quality control; Cleaning & drying; Fixturing & visual inspection; PVD coating; Quality control & thickness measurement and post-treatment (depending on the application). These steps are all available from one partner: HCVAC Technology, including mature technics and coatings.



Please feel free to contact us for further information!


Contact: Lillian Yang

Mobile: 0086-13825720037


Technical parameters:
Mode
Dimension
HCCA-1215HCCA-1612HCCA-1619
D1250*H1500mmD1600*H1200mmD1600*H1900mm
 
Coating mode and main confirguration
Six multi-arc targets + one set of column targets + one set of plane rectangle magnetron sputtering targets 
Six multi-arc targets + a pair of twin (MF)magnetron sputtering targets
Twelve multi-arc targets + two sets of  plane rectangle magnetron sputtering targets+ a pair of twin (MF)magnetron sputtering targets
Power sourceElectric arc power, DC magnetron power, MF magnetron power, filament power, pulse power, linear ionized source.
Process gas controlQuality flowmeter + electromagnetism ceramic valve
Vacuum chamber structureVertical single(side) door, pump system postposition, double water-cooling
Vacuum systemMolecule pump +Roots pump +Mechanical pump(5.0*10 -5 Pa)
Diffusion pump +Roots pump +Mechanical pump(5.0*10 -4 Pa)
Workpiece baking temperature 
Normal temperature to 350 centi-degree PID control, radiation heating.
Workpiece motion modePublic rotation Frequency control: 0-20 rotation per minute
Measure modeNumber display composite vacuum gauge: from atmosphere to 1.0*10 -5 Pa
Control modeManual/Automatic/PC/PLC + HMI/PC  four choice of control mode
RemarkWe can design the dimension of the equipment according to customer's special technique requirement.


Why a HCVAC system?
 
Over 1000 plants installed worldwide
Quick cycle times
High production capability with low energy consumption
More up time due to ease of loading/unloading and low maintenance
High productivity with only a single operator
Steel process chambers, built to last
Eco-friendly
Space saving design
PVD option available on all plants
1 year component warranty and 12 years minimum guaranteed working life
Complete global network of consulting, engineering and renowned after sales service
Product Tag:
Related categories:
Scroll to Top