High Strengthen Prefab H Section Frame Building Steel Structure for Workshop Warehouse

Min.Order: 500
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 30 ~ 38

Description


 

 

Steel Materials list
Item NameMaterials CharacteristicsMaterial GradeSurface Treatment
Steel ColumnH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel beamH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel BracingSteel Rod,Steel Pipe,Angle SteelQ235B,Q345BPaint or Hot dip Galvanized
Steel PurlinC or Z purlins(Thickness1.8mm~3.0mm)Q235B,Q345BHot dip Galvanized
External Wall panels,Roof panelsSingle colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU.Galvanized Steel+PaintingAlu-zin 150g,Fluorocarbon pain
Steel buildings DoorSlidding or Rolling doorSteel or Aluminum sheetPaint or Hot dip galvanized
Steel buildings WindowsAluminum alloy-Glass,Aluminum alloy-shutterT=1.0-2.0mmAlloy
Skylighting panelsFRP T=1.5mm-1.8mmCoefficient of thermal expansion:2.2x10-5/cmLight Tranmitar 85%
VentilatorTurbine ventilator on a ridgeSteel,Stainless steel ,PCPaint or Hot dip Galvanized
GutterGalvanized steel plate,Stainless steel plateT=2.0mmHot dip galvanized
DownpipePVC pipe,color steelpipe Y=0.5mmDia110mmpaint
Hight BoltOrdinary ,High strength10.9S,4.8SHot dip galvanized,Steel
Ground boltsSteel RodM24,M27,M30,M33,M39,M4210.9SSteel


 


Customized

Customized Workshop

Our goal is not only to provide high quality steel structure building, but also to maintain a personalized and professional relationship with each customer. No matter how big or small your requirement we will do our best to meet your demand. One stop service from design, manufacture, deliver to installation and after-service.

1.We can manufacture strictly accordingto your drawings and request.

2.We can design ourself to supply you a most suitable proposal to you.


 

 

 

 1.The industry's leading plasma slitting machine solves the defects of traditional flame cutting burrs;

2.Brand new high-strength steel plate with the material of certificate from first class steel mill , never use rusted stock;
3.Flexible design of welded H-beam, can process various models, fully save costs, 0 waste;
4.Welded H-beam double-sided for continuous full penetration submerged arc welding, which is as strong as hot-rolled H beam And the design is diversified;

5.The 3D drilling machine drill the web and flange hole in one time, which greatly improves the accuracy of the hole making compared with the magnetic drill;


6.Plasma punching machine, high-speed and accurate complete the hole of the sidde plate and rib plate, and the stamp mark is clearly visible after galvanizing or painting;

7.Our own hot-dip galvanizing zinc pot size 12.5*1.8*1.5m, annual productivity 100,000 tons.

 

 Product Show 


 


Standardized

 Standardized Workshop


 

 (1) The overall optimized roofing system stabilizes the main frame structure. 
A, Reduce the use of bracing bar. 
B, Compared with other manufacturers normally use more than 4 models of the purlins, we just use 2 models optimized purlins on our steel structures, which saves much shipping space and processing cost.

 

(2)  All the Purlin cleats and main steel structure bolts are versatile, which not only makes it more easier for installation, but also save a lot of shipping space.
(3)  The use of our new model Purlin cleat bans the traditional (welding cleat on the beam&column), which avoids the bending after the collision and saves much space during transportation.
(4)  We have the exclusive patent on rigid support, which replaces the flexible support brace.  Our rigid support makes the entire roofing system more stable while saving Knee-Brace compared with traditional steel structure.
(5)  A, The built-in galvanized gutter replaces the external gutter, which has good waterproof effect and promotes the roof system to be more stable while replacing the tie rod. It is more stable and cost effective,  what's more the appearance of the entire house is much better.
(6)  Our Sliding Door, we use single sliding door to replace double sliding door on normal steel structure.

 

 

Contact us for standardized workshop

 

Installation

Our new type steel structure is more convenient to install, 2,000 square meters can be completed within 1 week by 5 workers.


 

(1) The main steel frames(structure) are all connected by high-strength bolts, no need on-site welding. Its' installation is similar to building blocks.

(2) Totally 2 types of purlins will be used on roof and the walls of our Steel Structure.  (there are at least 4 types of purlins will be used on the roofing and walls by other manufacturers.)  So it can be constructed more easily without further distinction.

(3) The combination of Chemical bolt and chemical glue bans the complex steel cage foundation structure in traditional steel structures, making on-site construction more convenient. The columns are easier to align so that the steel structures are at the same level.

(4) The architectural installation drawings are easier to understand and can be installed in conjunction with the installation video, reducing the cost of assignments.

 

Extension

All our steel-structured houses can be extended on the original frame.


 

(1) The holes are reserved on the column of our steel structures, and the way of bolt connection makes the expansion more convenient in future.
(2) The installation and location of the our roofing purlins make expansion and construction easier in future.


Production Process


 


Package&Transport

Frame Steel Structure: Bundle Packing, Edge Wrapped by fabric Cloth
Purlins & Brace packaged with Bundle
Accessories packaged with Carton Box


 


Company Strength
Qingdao Yili Steel Structure Co., Ltd. is a large scale professional steel structure company which integrates the designing, manufacturing, processing, installing and after-service various steel structure projects, such as steel structural warehouse, workshop, agricultural project(horse, cattle shed, barn, and poultry house), garage and hanger.We have 17 years experience in steel structure project service. 

Our company is located at the Northern Industrial Zone of Qingdao City, the new hot spot for economy and investment. With a total building area of 30000 square meters, our company boasts much domestically advanced equipments, such as two steel structure automatic welding lines, two H steel beam molding lines.
The annual capacity of processing and manufacture is about 40,000 metric tons. The registered capital of the company is USD1,011,000. The qualification grade of our company is grade two for professional steel structure contracting. There are 163 employees in our company, among which there are 20 senior and intermediate engineers and technicians.

How To Buy

Basic Design Requirements: design Load: (very important) 
Design Load:
1. Snow load:
2. Wind load: 
3. Seismic magnitude:

Size:
6. Length ( m): 
7. Width ( m): 
8. Wall Height (eave, m): 
 

Building Purpose:    we will recommend the best design for the purpose of the building
A. Warehouse/Storage
B. Factory 
C. Agriculture Barn
D. Animal Farm (please confirm what kind of animal)
 

Product Tag:
Related categories:
Scroll to Top