Specification
Specifications | |||||
Model: | 1109 | Pipe Capacity: | 12" | ||
Adjustable height: | 82-140cm | Max load weight: | 2500 pounds (1133kg) | ||
Meas: | 95*22*22cm | Weight: | 16.5kg |
Model no. | G.W.(kgs) | N.W.(kgs) | Meas(cm) |
1109 Pipe Stand | 16.5 kgs | 15 kgs | 99*23*23cm |
Related Products
Model | Loading Capacity | Height Adjustment | Max. Loading Capacity |
1107 V-Head Pipe Stand | For 1/8"-12" (3mm-300mm) Pipe | 28"-52" (71-132CM) | 2500IBS (1134Kgs) |
1107C V-Head Pipe Stand | For 1/8"-12" (3mm-300mm) Pipe | 20"-36 1/2" (50.5-93.5CM) | 2500IBS (1134Kgs) |
1107B V-Head Pipe Stand | For 1/8"-12" (3mm-300mm) Pipe | 23 1/2"-42 1/2" (60-108CM) | 2500IBS (1134Kgs) |
1107-SB V-Head with single ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 28"-52" (71-132CM) | 1000LBS (454Kgs) |
1107-DB V-Head with Double ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 28"-52" (71-132CM) | 1500LBS (680Kgs) |
1107C-SB V-Head with single ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 20"-36 1/2" (50.5-93.5CM) | 1000LBS (454Kgs) |
1107C-DB V-Head with Double ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 20"-36 1/2" (50.5-93.5CM) | 1500LBS (680Kgs) |
1107B-SB V-Head with single ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 23 1/2"-42 1/2" (60-108CM) | 1000LBS (454Kgs) |
110B-DB V-Head with Double ball Transfer | For 1/8"-12" (3mm-300mm) Pipe | 23 1/2"-42 1/2" (60-108CM) | 1500LBS (680Kgs) |
1109 Roller-Head Pipe Stand | For 1/2"-12" (12mm-300mm) Pipe | 32"-55" (82-140CM) | 2500IBS (1134Kgs) |
Our Services
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. Free technical support and operation Video during lifetime
5. The continuous supply of the spare parts.
6. After you got our products, test them, If you have any questions with them, contact with us, we will offer a solve way accordingly.
Q1. Payment
A: Generally, we do T/T 100% in advance or T/T 50% as deposit, and 50% before shippment. We can also accept other terms according to the clients and order amount.
Q2. Terms of delivery
A: EXW, FOB, CFR, CIF.
Q3. Delivery time
A: 10-30 days after receiving your advance payment. The exact delivery time depends on the items and the quantity of your order.
Q4. Package
A: Generally, we pack our goods in Carton and in pallet if required.
Q5. OEM
A: If you can provide your samples or technical drawings. We can open the mold and produce accordingly
Q6. Quality test
A: we test 10% bulk before delivery
Q7. HS CODE
A: 7326901900