Small Roller V-Head Pipe Support with Steady Round Base

Min.Order: 20
Product origin: Taizhou, Jiangsu, China
Infringement complaint: complaintComplaint
US$ 51.7

Description
Product Description

1. Body is constructed of premium steel, which is resistant to rusk and corrosion.
2. Height: 42-67cm
3. The pipe stand can be folded up for easy transportation, storage and saving space.
4. Roller-head is durable.
5. Wide application: suitable for holding different kinds.

Detailed Photos

Durable Roller-head
Steady Round Base

Related Products

 

ModelLoading CapacityHeight Adjustment Max. Loading Capacity
1107 V-Head Pipe StandFor 1/8"-12" (3mm-300mm) Pipe28"-52" (71-132CM)2500IBS (1134Kgs)
1107C V-Head Pipe StandFor 1/8"-12" (3mm-300mm) Pipe20"-36 1/2" (50.5-93.5CM)2500IBS (1134Kgs)
1107B V-Head Pipe StandFor 1/8"-12" (3mm-300mm) Pipe23 1/2"-42 1/2" (60-108CM)2500IBS (1134Kgs)
1107-SB V-Head
with single ball Transfer
For 1/8"-12" (3mm-300mm) Pipe28"-52" (71-132CM)1000LBS (454Kgs)
1107-DB V-Head
with Double ball Transfer
For 1/8"-12" (3mm-300mm) Pipe28"-52" (71-132CM)1500LBS (680Kgs)
1107C-SB V-Head
with single ball Transfer
For 1/8"-12" (3mm-300mm) Pipe20"-36 1/2" (50.5-93.5CM)1000LBS (454Kgs)
1107C-DB V-Head
with Double ball Transfer
For 1/8"-12" (3mm-300mm) Pipe20"-36 1/2" (50.5-93.5CM)1500LBS (680Kgs)
1107B-SB V-Head
with single ball Transfer
For 1/8"-12" (3mm-300mm) Pipe23 1/2"-42 1/2" (60-108CM)1000LBS (454Kgs)
110B-DB V-Head
with Double ball Transfer
For 1/8"-12" (3mm-300mm) Pipe23 1/2"-42 1/2" (60-108CM)1500LBS (680Kgs)
1109 Roller-Head Pipe StandFor 1/2"-12" (12mm-300mm) Pipe32"-55" (82-140CM)2500IBS (1134Kgs)

Company Profile

Our Services

1. OEM Manufacturing welcome: Product, Package... 
2. Sample order 
3. We will reply you for your inquiry in 24 hours.
4. Free technical support and operation Video during lifetime
5. The continuous supply of the spare parts.
6. After you got our products, test them, If you have any questions with them, contact with us, we will offer a solve way accordingly.

FAQ

Q1. Payment
A: Generally, we do T/T 100% in advance or T/T 50% as deposit, and 50% before shippment. We can also accept other terms according to the clients and order amount. 

Q2. Terms of delivery
A: EXW, FOB, CFR, CIF.

Q3. Delivery time
A: 10-30 days after receiving your advance payment. The exact delivery time depends on the items and the quantity of your order.

Q4. Package
A: Generally, we pack our goods in Carton and in pallet if required. 

Q5. OEM
A: If you can provide your samples or technical drawings. We can open the mold and produce accordingly

Q6. Quality test
A: we test 10% bulk before delivery

Q7. HS CODE
A: 7610900000

Welcome to purchase!

Scroll to Top