High Efficient Factory Spplier Auto Molding Machine in China

Min.Order: 1
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 10000 ~ 40000

Description
High Efficient Factory Spplier Auto Molding Machine in China

Company Advantage
1. CE, ISO9001, TUV Certificate.
2.100% meet your requirement.
3. Sell to about 126 countries on 6 continents.
4. One year quality guarantee and long-term technical support;
5. With more than 40 years of history in the rubber machine industry.
Vulcanizing Press Describe
1. The press has two electrical platens (one working layer)
2. Automatic press with PLC.
3. Height from floor to underside of top heated platen according to clients requirements design.
4. Daylight when press open according to clients requirements design.
5. Independent control panel.
6. Hot plates made of HT200, surface by surface grinding processing, plate face to face parallelism accuracy ± 0.05mm, finish is 1.0μM.
7. The wires are connected machines, as long as the power supply is connected, the machines can work.
 

>>MAIN TECHNICAL SPECIFICATION
/Type/Clamping force(ton)100T150T200T250T300T350T400T500T600T
Stroke(mm)350300250250250300300300300
Heating plate size(mm)450x450460x460546x560642x600700x700750x750800x800900x900950x950

Diameter of cylinder(mm)
250300350400450500500560600

Horse power(hp)
7.5x210x210x210x210x210x210x215x215x2

Type of mold opening
Up/Down-In/Out-2RT/3RT/4RT
Heating power(kw)181827383846505664

Total power(kw)
292938495361657886


>>FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5.How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation,quality,integrity and efficiency. Also we have had many good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
6.How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao liuting airport.
We will pick up you at the airport.
Product Tag:
Related categories:
Scroll to Top