Prefabricated Building Metal Building Material Steel Structure Building/ Steel Structure Hangar/Steel Frame/Steel Building/Steel Shed/Steel Construction

Min.Order: 500
Product origin: Qingdao, Shandong, China
Infringement complaint: complaintComplaint
US$ 30 ~ 69

Description

Qingdao COSMO steel structure Hangar and Garage has features of high fire resistance, strong corrosion resistance. Steel structure workshop/warehouse/hangar etc is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.

 

The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. Composite panel for roof and wall can also be used in our system such as polystyrene, glass fiber, rock wool, polyurethane sandwich panel which have good thermal insulation, heat insulation, fire-retardant performace. The wall of the steel structure maintenance also can use brick wall.


Specification of Steel Structure
ITEMS SPECIFICATION
Main Steel FrameColumQ235,Q345 Welded H Section Steel
BeamQ235,Q345 Welded H Section Steel
Secondary FramePurlinQ235 C and Z purlin
Knee braceQ235 Angle Steel
Tie RodQ235 Circular Steel Pipe
BraceQ235 Round Bar
Vertical and Horizontal SupportQ235 Angle Steel, Round Bar or Steel Pipe
Maintenance SystemRoof  SystemRoof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories
Wall SystemWall Panel (Sandwich Panel or Corrugated Steel Sheet
Window SystemAluminum Alloy Window/ PVC Window/Skylight
Door SystemSliding Sandwich Panel Door/Rolling Metal Door/PVC Door
OthersPVC Rainspout,Gutter etc
Wind Resisitance Grace12 Grades
Earthquake-resistance8 Grades
Structure life spanUp to 50 years
TemperatureSuitable temperature -50ºC~+50ºC
CertificationCE, SGS, ISO9001:2015, ISO 14001:2015
Finishing OptionsVast array of colors and textures available
Paint OptionsAlkyd painting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized.

Projects

Main Components

Steel Structure Workshop, Prefabricated Steel Structure Building:
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO: 9001: 2008
3. Cost considering: Time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.


Packing and Delivery


COSMO packs the steel structure components by steel structure frame. When we load the goods,we can load it as a complete structure. In this way, we do not have to use 40 OT container. We can use 40HQ container,saving freight greatly.The loading time for 1 container only takes 30 minutes.In one day, we can load 20 containers easily.We can ship 1000 Tons in one shipment schedule.


Workshop

Customer from all over the world


Our company

COSMO is located in Qingdao city, China. The containers are decorated for different use, like, office, sports goods store and coffee bar etc. All materials, decoration schemes and installation are customized according to customer's requirements. With more than 15 years of international project operation experience and technology reserve, COSMO has formed a perfect one-stop systematic solution service capacity in steel structure construction industry, pharmaceutical manufacturing industry,medical care service,electronic and biotech industry, serving customers from more than 50 countries and regions in the world. COSMO business scope covers project consultancy, design, R&D, delivery and construction.

FAQ

Question A: Does this kind of house can only be used in residential buildings?
Answer A:Of course not.Our houses can be used not only as a residence buildings, but also as a small shops, bars, coffee bars, fast food restaurants, or any buildings you want them to be.
 
Question B:How can I buy this house?
Answer B:It is so easy. You just need to send an inquiry or message to contact our salesman, then they will guide you how to buy this house
 
Question C: After buying your houses, if I don't know how to install it, can you provide technical support?
Answer C:Yes.We have prepared a free tutorial for on-site installation of  houses for you, you can follow our tutorial step by step to complete your house installation.Or according to the situation at that time, we can send our engineers to your site to guide or install.
 
Question D:How long will it take to complete the installation of a container house?
Answer D:In general, the installation of a container house can be completed in 2 to 5 hours.

Product Tag:
Related categories:
Scroll to Top