Description
1. INCINERATOR OVERVIEWWFS series of life and (medical) waste incinerator is ShanDong Better Environmental Protection Technology Co.Ltd,our company introduced the world's advanced incinerator technology, researched and organized technical experts,developed with independent intellectual property rights of garbage incineration equipment. The device is fully enclosed, with smallvolume, high burning efficiency, reasonable process, leading technology, high degree of harmless,etc, are the ideal garbage treatment equipment for all kinds of hospitals, hotels, railway stations, large commercial institutions.
2. ADVANTAGE1) Long lifetime
2) Totally enclosed operation
3) Suitable for treating infectious waste
4) Avoid secondary pollution
5) Simple operation
6) Small size, small footprint.
3. MAIN FEATURES1) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
2) Gasified incineration is used for burning animal carcasses,syringe, paper waste, bandage, absorbent cotton and other medical wastes.
3) Daily waste can be burned once by gasified incineration.
4) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
4. APPLICATION1) All kinds of animal carcasses
2) Hospitals
3) Hotels
4) Stations
5) Industries
5. TECHNICAL PARAMETER Model | WFS-30 | WFS-50 | WFS-150 | WFS-300 | WFS-500 |
Burning capacity | 20-30kg/time | 30-50kg/time | 100-150kg/time | 200-300kg/time | 300-500kg/time |
incinerator Size (L*H*B) | 1.45*0.9*1.75m | 1.8*1.15*3m | 2*1.4*3.5m | 2.2*1.4*3.8m | 3*2*4.8m |
imputing mouth width (mm) | 480*600 | 620*800 | 760*960 | 900*1100 | 1080*1280 |
Chimney external diameter (mm) | 280 | 280 | 300 | 400 | 460 |
draught fan | 0.37w | 0.37w | 0.5w | 1.1kw | 1.1kw/0.55kw |
Combustion improver device | 0.11kw Oil consumption: 4-6kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.22kw Oil consumption: 7-14kg/h | 0.22kw Oil consumption: 7-14kg/h |
Re-burning device | 0.11 kw Oil consumption 4-6 kg/h | 0.11kw Oil consumption: 4-10kg/h | 0.22kw Oil consumption: 7-14kg/h | 0.37kw Oil consumption: 10-20kg/h | 0.22kw Oil consumption: 15-26kg/h |
voltage | 380v/220v | 380v/220v | 380v/220v | 380v/220v | 380v/220v |
Weight(kg) | 2300 | 4000 | 7000 | 8000 | 13000 |
6. INCINERATION TECHNICAL INDEX Indicator waste type | ncinerator temperature(ºC) | Flue gas retention time(s) | Burning Rate(%) | Burned Removal rate(%) | Thermal reduction of incineration residue(%) |
Hospital clinical waste | ≥850 | ≥2.0 | ≥99 | ≥99 | ≤5 |
After-Sales Service1.Warranty is 12 months from the time machine is fully installed. In this period, under normal operating conditions, if malfunction is caused by product quality, we will provide free repairs.
2,supplied warranty including:
(1)In warranty period, if malfunction is caused by design, produce etc. quality of product, we will provide free repairs;
(2)In half year after run testing, if accessories is with quality problem and be replaced, we supply 12 months warranty for new accessories;
(3)In 7~12 months after run testing, if accessories is with quality problem and be replaced, we supply 6 months warranty for new accessories;
(4) If malfunction is caused by wrong man-made operating or natural disaster etc., it is out of our warranty scope, but we can help to relieve malfunction, your esteemed company should pay for the charge;
3,if incinerator can not meet requirement of client, we must improve within a definite time.
4.If your company needs us to send engineers to the site to guide the installation of the incinerator, Engineers Guide Service Available:USD100/day engineer salary(The engineer's accommodation and round-trip air tickets are provided by your company.)
5,below items are free of charge we supply:
(1)after incinerator is finishing completed installation, we train operating staff for client free of charge.
A,Participate in installation and debugging of incinerator, know well for technology and structure, function of incinerator etc.
B,We supply operating and maintenance instructions.
C,We supply site operation training, and common trouble removal.
6,after warranty period, we supply lifelong maintenance service and spare parts supply, and charge cost price.
7,we supply complete technology consulting and after-sale service.
FAQ1.Q:Are you a factory or trading company?
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
2.Q:Where is your factory located? How can i visit there?
A: Our factory is located in No.1137 Guanhai road , Zhucheng City, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.
3.Q: Do you have minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
4.Q: Do you have certificates?
A: Yes, we have ISO,SGS,CE certificate.
5.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
6. Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
7. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
8. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
9. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
10. Q: How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
11. Q: How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
12. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.