The barbed wire making machine is divided into
1. Double strand barbed wire making machine (CS-A)
2. Single strand barbed wire making machine (CS-B)
3. Positive and negative twist barbed wire making machine(CS-C)
Motor power | 2.2 kw | |||
Theoretical output | 40kg/h | |||
Machine weight | 1080 KG | |||
Barbed Distance | 3'(7.5cm) 4'(10cm) 5'(12.5cm) 6'(15cm) | |||
Producing speed | 3'(540m) 4'(720m) 5'(900m) 6'(1080m) | |||
Line wire diameter | 1.6-2.8 mm | |||
Barbed wire diameter | 1.6-2.4 mm | |||
Main drive shaft speed | 402 r/min | |||
Overall dimension | 3000*1100*1300 mm |
Feeding wheel.
The surface of the feeding wheel has been specially treated, which is durable. It can smooth the wire and reduce faults.
Twisted head.
The screw thread system has the advantages of simple structure, convenient operation and easy replacement of twisted head.
Mechanical parts
The mechanical parts are made of alloy steel to ensure the long-term operation and overall service life of the machine.
Electric box.
There are start button, stop button and emergency stop button on the electric box. The counter can set the output automatically.
Traverse device.
Traverse device can automatically move the position to make the take-up more uniform and beautiful.
Take up reel.
Take up reel can be customized according to customer requirements, including the size and diameter of the reel.
Pre-sale service
1. Inquiry and consulting support
2. Sample testing support
3. View our factory
After-sales-service
1. Training how to instal the machine ,training how to use the machine
2. Engineers available to service machinery overseas
Q: Are you a trading company or manufacturer?
A: Our company is a factory integrating production and sales. We can provide competitive prices and services.
Q:Where is your factory located?
A: Our factory is located in Anping county, Hebei Province of China. The nearest airport is Beijing airport or Shijiazhuang airport. We can pick you up from Shijiazhuang city.
Q: How many years are your company engaged in the wire mesh machines?
A: More than 20 years. We have our own technology develop department and testing deparment.
Q: Can your company send your engineers to my country for machine installation, worker training?
A: Yes, our engineers went to more than 60 countries before. They are very experienced.
Q: What's the guarantee time for your machines?
A: Our guarantee time is 2 years since the machine was installed in your factory.
Q: Can you export and supply the customs clearance documents we need?
A: We have much experience for exporting. And we can supply the CE certificate, Form E, certificate of originetc, your customs clearance will be no problem.