Inconel 600 Low MOQ Nickel Alloy High Temperature 1-24'' Forged Threaded Tee for Piping

Min.Order: 1
Product origin: Shanghai, China
Infringement complaint: complaintComplaint
US$ 7.05 ~ 7.25

Description

Product Description
Product Name
Nickel Alloy Tee
Pipe Length
Single Random Length and double Random Length. SRL:3M-5.8M DRL:10-11.8M or As clients requested length. 
Size
Size 1/4" to 24" Outside Diameter 13.7 mm to 609.6 mm
Wall thickness
SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS
Materials
Nickel Alloy, Alloy steel.
Standard
API5L , ASTM A106 Gr.B, ASTM A53 Gr.B, ASTM A179/A192/A213/A210 /370 WP91, WP11,WP22 GB5310-2009, GB3087-2008,GB6479-2013,
GB9948-2013, GB/T8163-2008, GB8162-2008,GB/T17396-2009
Surface
Carbon steel seamless pipes :Rust-proof black painting
Payment term
T/T, L/C at sight, etc
Delivery Time
10-40 days
Applications
1.Fluid pipe 
2. Power Plant 
3. Structure pipe 
4. High and low pressure Boiler tube 
5. Seamless steel tubes for petroleum cracking
6. Conduit pipe 
7. Scaffolding pipe pharmaceutical and ship building etc
Certificate
API5L ISO 9001:2008 TUV BV etc
End treatment
Under 2 inch plain end. 2 inch and above Beveled
 
Company Profile
Product Testing
Process flow
Certifications
Our Advantages
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term
cooperated agent also available.
FAQ
FAQ
 
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.
Product Tag:
Related categories:
Scroll to Top