Three Vessel Beer Brewing Equipment
The micro beer brewery equipment is one of our most hot sale capacity for starting a new beer brewing business and it is the most typical and common system in Microbrewery, Brewpub, Bar and Restaurant etc.
The tank is usually made of stainless steel. If you want to display your beer equipment, the red copper is a better choice, because it has a luxurious appearance to display your brewing process. However, the budget is higher than Stainless Steel.
We use strict technology, and each tank has passed a rigorous water vapor leakage test to ensure normal operation under standard atmospheric pressure. The request of the electric is 3phase or single phase, If your equipment is large, 3 phase electric is necessary; if you only want to use it for home, hotel or microbrewery, you can choose the single phase.
1) The brewhouse combination is MT + LT + KWT + HLT.
2) Grist hydrator placed on the top of mash tun, which can be used for pre-mashing, and remove dust.
3) Wort collect rings under the bottom of filter, which has 4 wort outlets. So the wort can flow through by multi routes rather than single route, it is good for speeding up filtering progress.
4) Anti-Rinser under the bottom of filter as well, which was designed 4 spray nozzles. It can be used for cleaning false bottom and loosen grain bed during lautering.
5) Flowmeter for testing hot water consumption for sparging or mashing.
Output/Brew | 10HL | 12HL | 15HL | 20HL | 25HL | 30HL | 35HL |
Brews/Week | 6~12 | 6~12 | 6~12 | 6~12 | 6~12 | 6~12 | 6~12 |
Output/Week | 60~ 120HL | 72~ 144HL | 90~ 180HL | 120~ 240HL | 150~ 300HL | 180~ 360HL | 210~ 420HL |
Electric Supply | 3phase/380(220, 415,440)v/50 (60)Hz Single Phase/ 220(110, 240v)/50(60)Hz | ||||||
Heating Source | Steam/Directly Fired | ||||||
Area Request | >70M2 | >80M2 | >100M2 | >120M2 | >140M2 | >150M2 | >180M2 |
Brewmaster | 1 | 1 | 1 | 2 | 2 | 3 | 3 |
Note: 1hl=100liter; 1Gallon=3.7854liter; 1Barrel (BBL) =117Liter;
Output/Brew | 2HL | 3HL | 5HL | 6HL | 8HL | 10HL |
Brew/Week | 2~6 | 2~6 | 2~6 | 2~6 | 2~6 | 2~6 |
Output/Week | 4~12HL | 6~18HL | 10~30HL | 12~36HL | 16~48HL | 20~60HL |
Electric Supply | 3phase/380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz | |||||
Heating Source | Electric/Steam | |||||
Area Request | >25M2 | >30M2 | >45M2 | >50M2 | >60M2 | >70M2 |
Brewmaster | 1 | 1 | 1 | 1 | 1 | 1 |
Note: 1hl=100liter; 1Gallon=3.7854liter; 1Barrel (BBL) =117Liter;
Milling System | Mill machine | Stainless steel |
Grist case | Stainless steel | |
Flexible conveyor | Outer PPR or Stainless steel | |
Brewhouse System | Mash tun | -Inner:3mm; outer:2mm-Motor agitation-Steam jackets/Electric elements/Fire direct heating |
Lauter tun | -Inner:3mm; outer:2mm-Rack knife system -False bottom filter -Wort Grant | |
Brew Kettle | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
Whirlpool Tank | -Inner:3mm; outer:2mm-Side tangent whirlpool inlet | |
Hot water tank | -Inner:3mm; outer:2mm-Steam jackets/Electric elements/Fire direct heating | |
Accessories | -Mash pump; Heat-exchange plate; Hop back system; Brewhouse Pipes; | |
Fermentation System | Fermentation tank | -Pressure:3 Bar-Inner:3mm; outer:2mm; with insulation -Cooling jackets |
Cooling System | Glycol water tank | -Inner:3mm; outer:2mm |
Cold water tank | -Inner:3mm; outer:2mm | |
Accessories | Chiller; Glycol water pump; Pipes & Valves | |
CIP System | Acid tank, Caustic tank, Trolley | -Pump; Pipes & Valves-Accessories of the CIP System |
Control System | -Automatic/Semi-auto | |
Filtering System | Candle type diatomite filter/Membrane filter/Bag filter | |
Bright beer tank | Double-layer with insulation | |
Filling System | Glass bottle line | Capacity:800-1200 BPH-Washing heads:8; Filling heads:8; Capping heads:3 -Optional: Capacity:1500-2000 BPH -Washing heads:16; Filling heads:16; Capping heads:6 |
Canning line | Capacity:1000-1500 CPH-Filling heads:12; Capping heads:1 | |
Keg system | Keg filling machine; Keg washing machine; Keg washing and filling unity machine |
Our company is a professional beer equipment manufacturer. We are specialized in professional design, manufacture, installation and commissioning of various beer equipments and supporting facilities for about 16 years and we got CE PED certificate, ISO9001 certificates as well
as Factory Audit report by SGS and TUV. Our products include mashing equipment, fermentation equipment, yeast spread cultivation equipment, and refrigeration equipment for small and medium-sized brewery, hotel, pub and etc.
1. One Stop Service from malt to beer
2. Design Customization: Tanks structure, pipeline, installation
3. 5 Years Warranty for tanks, free delivery for broken accessory within warranty
4. With ISO TUV SGS certificate, the product meets the GB/CE/PED/ASME standard
5. Local service in EUROPE, AUSTRALIA ETC
6. More than 1100+ global users
a.) Free consultation service before, during, and after sales; | ||||||
b.) Project planning and design services; | ||||||
c.) Free debugging instruction of equipment until everything is functional; | ||||||
d.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer; | ||||||
e.) Training of equipment maintenance and operating personally; | ||||||
f.) New production techniques; | ||||||
g.) Provide 36 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free; |
1.Q:Does your company have foreign installation experience? A: Yes, our company has installation experience in USA, Canada, Europe, Australia, Malaysia, Myanmar, South Africa etc.
2.Q: Do you have a professional engineer or after-sales team in our country? A: Yes, our equipment is sold to 103 countries and areas and we have our local after-sales service personnel in Europe, America and Asia.
3.Q:How can you guarantee the delivery date of the equipment after we place the order? A: The delivery time can be ensured through Alibaba Credit Insurance orders.
4.Q:What payment methods are supported? A:T/T, L/C, Credit Card, VISA, Apple device, Western Union.
5. Q: How long the warranty will be? A: 5-year warranty, only for tanks, excluding electrical appliances, wearing parts such as cushions, seals, etc. (mixing seals, pump seals, butterfly valves and other valve seals), pumps.
6. Q:How about the installation and training? A:We can supply the installation and training. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
7.Q: Can I be your company's sales agent? A: Yes, it's our pleasure. We very much welcome you to join us. Please contact us to discuss specific details. 8.The price does not include electrical appliances, etc.