Sliding Table Panel Saw CNC Melamine Board 3200mm Wood Cutting Machine

Min.Order: 1
Product origin: Jinan, Shandong, China
Infringement complaint: complaintComplaint
US$ 2750 ~ 3250

Description
Product Parameters
Precision Sliding Table Saw:

1.Improved internal structure to ensure stable and precision working environment.
2.High Precision steel guide rail has been processed ultrahard, which guarantees guide precision and enduring.
3.Accurate and solid rip fence with fine adjustment function.
4.Adjustment saw blade protection extraction hood.
5.Saw blade manual tiltable (0°- 45°).

 

Model
Z560
Push table size
3000mm
Maximum sawing length
3000mm
Maximum sawing width
unlimited
Diameter of saw blade
300-350mm
Max. sawing thickness
80mm
Spindle speed
4500-6000r/min
Spindle diameter:
30mm
Angle of saw blade
45°C-90°C
Main motor power
5.5kw
Auxiliary shaft diameter
20mm
Auxiliary motor power
0.75kw
Lifting motor power
6000N
Net weight
800kg
Overall dimension
3000mm*900mm*1000mm
Detailed Photos

Product Application

Company Profile

Certifications

FAQ

Q1: I already have an edge banding machine and I would like a trimming machine. Do you have any recommendations?

A: Yes, we have a matching trimming machine. You can choose the product that suits you according to your actual production needs. Of course, we will also ask you some questions, such as plate size, plate thickness, equipment voltage, number of workers, and so on. With so many types of products, there is always one that is suitable for you.
 
Q2: Can your edge banding machine use PUR adhesive?
A: PUR glue has high requirements for glue pots. We recommend using models such as F14620-3700-3350 for up glue pots, depending on your specific needs.
 
Q3: Are you a factory or a trader?
A: We are a 20 year source production factory with rich production experience and a total of 8000+customers. We can provide you with thoughtful and accurate after-sales service.
 
Q4: How should I make the payment?
A: Firstly, you will pay a 50% deposit as a prepayment, and then we will start producing the equipment. After the
equipment is completed, I will send you photos and videos, and you can make the remaining payment. After receiving all the payment, we will arrange for the fastest container to ship to you. You will receive the equipment soon, and I will arrange professional technicians to coordinate with you regarding installation issues.
 
Q5: How long is the delivery time?
A: Conventional equipment takes 10-12 days, customized voltage or other parameters take around 30-45 days.
Product Tag:
Related categories:
Scroll to Top