Diesel Generator Parts Automatic Voltage Regulator AVR R438 Three Phase AC Voltage Stabilizer

Min.Order: 1
Product origin: Fuzhou, Fujian, China
Infringement complaint: complaintComplaint
US$ 15 ~ 35

Description
Diesel Generator Parts Automatic Voltage Regulator AVR R438 three phase AC voltage stabilizer 
AVR R438 for power generator 3phase R438 is a half-wave phase controlled thyristor type Auto Voltage Regulator and forms part of the excitation system for a brushless generator.AVR for power generator 3phase R438 is a half-wave phase controlled thyristor type Auto Voltage Regulator and forms part of the excitation system for a brushless generator.
Automatic Voltage Regulator R438
Voltage Regulation ±0.5%
Remote voltage adjustment range±0.5%
Short circuit capability3 x Irated for 10 seconds
Standard power supplyAREP or PMG
Rated overload current8 A - 10 s
Voltage sensing5 VA isolated via transforme
0-110V terminals95 to 140V
0-220V terminals170 to 260V
0-380V terminals340 to 520V
Voltage regulation± 1%
Current sensingC.T.2.5VA cl1,secondary 1 A 
Voltage sensing95~140 volts (50/60 Hz) 
170~260 volts (50/60 Hz) 
340~520 volts (50/60 Hz)
Fit for1000 series generator
2000 series generator
3000 series generator



Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQ
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!
Product Tag:
Related categories:
Scroll to Top