Description
diesel brush type 3 phase generator voltage regulator r450 avr priceLeroy Somer R450 AVR,R450 is analog Automatic Voltage Regulator with transistors. for LSA 46.2, 47.2, 49.1 and LSA 50.2 altern2.Applications§ standard : for LSA 46.2, 47.2, 49.1 and LSA 50.2 alternators.§ optional : for LSA 42.2, 43.2, 44.2. alternators Adapted to the SHUNT, AREP or PMG excitation systems.3.R450 Main characteristics§ Voltage regulation +/- 0.5% at steady state and constant speed.§ Control by transistor means that the regulation quality is independant of applied load.§ Phase to phase voltage sensing.§ Suitable for high levels of vibration and harsh environments.§ Integrated "LAM" and " auto adaptative LAM" system to cope with load impacts applied to the engine§ AREP or PMG excitation with normal or fast response.§ Single or three phase voltage sensing with optional module.§ Rotating switch facilitating selection.Part Number: | R450 |
After-sales Service Provided: | Video Technical Support, Online Support |
Place of Origin: | China |
Stock: | Yes |
Packaging: | Carton |
Warranty: | 1 Year |
Our ServicesGuangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
FAQQ1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!